Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a civil project in Asheboro, North Carolina. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
Improvements to existing stormwater pump station including new 500 gpm submersible pumps, controls, associated appurtenances, replacement of approximately 60 LF of existing force main, and replacement of approximately 50 LF of existing gravity main. a. Project has been downloaded by Terrys Plumbing, SKC, and Dellinger. b. The proposal is a Lump Sum contract - signature pages were not included in the bid documents and will be provided with the Addendum No.1. These pages need to be completed when submitting your bid. c. MWBE Requirements apply to this project 10% goal provide appropriate affidavits with Bid and during the project. Guidelines are provided in project manual. Submit HUB Certification Participation form with Bid along with Attachment A or B. d. No Bid Bond is required to be submitted with the bid. Also, Performance and Payment Bonds will not be required. For Contract execution, submit Appendix C or D and other required documents. e. Time of Completion in the Project Manual is 60 days and Liquidated damages of $500 as described on first page of Supplementary General Conditions. We will work with the contractor for start of project time based on anticipated delivery of the pumps and controls. f. Work hours: Zoo verify - 8:00 - 5:00 weekdays. If needed other work times can be arranged if coordinated with Zoo staff. g. Parking should be off site at other Zoo parking area to limit number of vehicles on site to 1 or 2. Access for equipment and material delivery should be coordinated with Zoo staff. h. Replace stormwater line as noted on plans. i. Bypass pumping will be required while the pumps are out of service. This will be to handle constant water entering the stormwater system and when a storm occurs. The capacity shall be based on the proposed pump capacity of 500 gpm. Discharge can be in the last MH or directly into the pond as long as there is a settling area for the flow and the pipe is set so it can be driven over. j. Electrical improvements include setting a weather shield over the new Stormwater pump control panel and the existing sewer pump control panel.
Bid Results
Water / Sewer
$275,000.00
Public - State/Provincial
Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 15, 2022
January 16, 2023
4401 Zoo Pkwy, Asheboro, NC
Related To This Project
Asheboro, NC
Bid Date: Apr 12 2022
Asheboro, NC
--
Asheboro, NC
Bid Date: Apr 28 2022
Asheboro, NC
--
Asheboro, NC
--
Asheboro, NC
Bid Date: Apr 28 2022
Asheboro, NC
Bid Date: Apr 26 2022
Asheboro, NC
Bid Date: Apr 19 2022
Asheboro, NC
Bid Date: Jun 29 2023
Asheboro, NC
Bid Date: Jul 26 2022
Asheboro, NC
Bid Date: Nov 29 2022
Asheboro, NC
--
Asheboro, NC
--
Asheboro, NC
Bid Date: Oct 20 2022
Asheboro, NC
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.