EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 28, 2023 at 7:00 PM

Updated October 1, 2024

Renovation of a library in Shirley, New York. Completed plans call for the renovation of a library.

As of February 28, 2023, this project has not yet been awarded. A timeline for award has not yet been established. The Mastics Moriches Shirley Community Library hereby invites the submission of sealed Bids for the following work: CONTRACT 26-0 100 Electrical Bid packages - Complete line and low voltage electrical systems for the renovation of a 45,000 sqft building. Low voltage work, as qualified in this booklet, are listed under alternate bid items. Location- 407 William Floyd Parkway, Shirley SED PROJECT CONTROL NUMBER #58-02-32-03-6-007-010 Please deliver checks to the Mastics Moriches Shirley Community Library at the MASTIC BEACH ANNEX - Temporary Business Office Trailer, Attn: Business Office, 369 Neighborhood Road, Mastic Beach, NY 11951 from , 10;00 AM to 3:30 PM daily except Saturdays, Sundays, and Holidays. A Bid security in the amount of 5% of the base Bid (for Bid Bond), or 5% of the base Bid maximum of $5,000 (for Bid security provided by check) is required. Each Bidder must indicate the seg ments) of the contract that will be completed by the Bidder itself and which segment(s) by subcontractors. Only the registered Bidder will be permitted to submit a Bid. A Bid may be rejected in the interest of the Owner based on the extent of proposed delegation of the perfor mance of the contract to subcontractors and/or based on the level of qualification and experience of the Bidder or proposed subcontractors. Any Bids received later than the prescribed date and hour will be rejected. The Mastics Moriches Shirley Com munity Library Board of Trustees reserves the right to reject any or all Bids submitted in the best inter ests of the Owner and to waive any informality in any Bid and shall further make awards in any manner it deems advisable inthe best inter ests ofthe Mastics Moriches Shirley Community Library. The successful Bidder shall be required to execute a formal contract with the Mastics Moriches Shirley Community Library. Each Bidder shall agree to hold its Bid price for forty-five (45) days after the formal Bid opening All line voltage work, including the following: o Conduit, wiring, terminations for all HVAC, other mechanical equipment and components and electric equipment and devices and equipment shown on the plans o Saw cutting, concrete removals, trenching, backfill/compaction, vapor barrier, and patching of concrete slabs for all slab on grade floor boxes and any other under slab work required to complete the work of this contract o Roof penetrations as required Electrical Service work including the following: o Disconnect existing primaries to existing transformer, PSEG to remove transformer and set aside o Remove existing vault cover o Provide new secondary feeders within existing conduit runs already routed to main electrical room (sizes per E-600) o Vault cover to be rotated 90 degrees counterclockwise resulting in transformer doors facing east o PSEG to reinstall transformer o Electrical Contractor (EC) to terminate existing primaries and new secondaries All electrical (line and low voltage) work required for the operation of the I/A new sanitary waste disposal system as described or implied on Dwg C 1-0, including conduit, trenching, cabling, terminations, etc. Electrical Contractor to provide power to control panel from disconnect, and power pumps from control panel. Power and switching to the existing sewerage ejection pump in Mech Room C 07. Feed power from 35/37/38 in panel M2. Power to existing ejector pump in Mechanical room B12 to be fed from 20A spare from panel RB. Provide power to EWH5 in rooms 112 and 113. Provide power to EWH4 in room 137. Power and switching to existing book lift controls/motor. 208 3 phase 30 amp to be fed from MDP panel. Change one of the 20/3 spare breakers into 30/3. Provide dedicated 20amp receptacle within hot box enclosure located on North elevation of building outside door 125A. Provide disconnect of office trailer and removal of 200 amp temporary service in the NW corner of the site at the end of the project when directed by PM. Provide removal of the temporary 400 amp service in SE corner of site once permanent power to the building has been established. Provide all rigging/modifications to the new switch gear as required to place within electrical room.

Post-Bid

Library

$400,000.00

Public - County

Renovation

205

37

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Manufacturer Qualifications, Manufacturer?s Field Services, Temporary Facilities and Controls, Temporary Controls, Temporary Environmental Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Stone Anchors, Unit Masonry, Concrete Unit Masonry, Stone Assemblies, Stone Masonry, Manufactured Masonry, Cast Stone Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Support Assemblies, Metal Fabrications, Metal Railings, Decorative Metal
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Wood Treatment, Rough Carpentry, Sheathing, Insulating Sheathing, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal and Moisture Protection, Preparation for Re-Roofing, Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Thermal Insulation, Exterior Insulation and Finish Systems, Steep Slope Roofing, Shingles and Shakes, Roofing and Siding Panels, Metal Roof Panels, Composite Wall Panels, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Automatic Entrances, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Wood Windows, Roof Windows and Skylights, Unit Skylights, Metal-Framed Skylights, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Access Flooring, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting, Exterior Painting, Interior Painting, Decorative Finishing
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Fireplaces and Stoves, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Furnishings and Accessories, Bedroom Furnishings, Blankets, Rugs and Mats, Entrance Floor Mats and Frames, Floor Mats, Runners, Furniture, Systems Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Wheelchair Lifts, Platform Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Electrical, Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Solid Waste Control

Find More Local Projects

Within 75 Miles of This Project
428
Active Projects
259
Bidding Soon
4,165
All Active Projects
1,899
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 29, 2022

January 30, 2023

img_map_placeholder

407 William Floyd Pkwy, Shirley, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Main Library Renovation Project for the Mastics Moriches Shirley Community Library - Electrical

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.