Site work and renovation of a playground / park / athletic field in Hampton Township, Pennsylvania. Completed plans call for the renovation of a playground / park / athletic field; and for site work for a playground / park / athletic field.

1.01 DESCRIPTION A. Work Summary: The North Park Water Tower Restoration project is defined by the Construction Documents and Specifications. A general summary of Work is as follows: Provide labor, materials, and equipment required to Perform Work under following Prime Contracts: 1) General Construction a) Sandblast, prime and paint inside and outside of water tower structure, including dome, per plans/specs. Existing lead paint on tower requires removal/remediation per plans/specs and in accordance with environmental regulations. b) Modify existing steel spiral staircase railing by full welding additional baluster between existing balusters. Prep and paint staircase, per plans/specs. c) Add stainless steel handrail to existing railing at overlook deck, per plans/specs. d) Remove existing circular terrazzo concrete bench/vent at center of overlook deck, replace with GFRC replica, per plans/specs. e) Repair existing observation deck terrazzo floor, per plans/specs. f) Demolish existing security door entrance to tower staircase. Fabricate new security door entrance at landing 1, with stainless steel mesh surround, per plans/specs. g) Demolish and replace 2 concrete steps and concrete landing, with added frost-resistant foundation wall, at base of tower stairs, per plans/specs. h) Structural/cosmetic repairs on steel tower and stairs, per plans/specs. i) Other work, as specified2) Electrical Construction a) Demolish all existing electrical conduit and fixtures on tower, and underground feed to tower from adjacent Lodge building. b) Furnish and install new Quazite box with new electric feed, and spare conduit, fed from Lodge building. c) Run new duct bank/power from Lodge to tower, and compact/restore all trench work. d) Furnish and install new conduit, wire, required to install new: light fixtures at landings and along staircase between landings; LED rope lighting at interior of tower dome; aviation obstruction lights around perimeter and top of dome; and receptacles and switches; per plans/specs. All new conduit need painted to match tower. 1.02 CONTRACT DURATION A.Perform construction work within 180 consecutive calendar days from Notice to Proceed (NTP). repair and alteration level 1 to existing water tower to arrest rusting, improve safety, and reopen to public as observation platform. work includes repainting interior and exterior of tower, stair, and guardrail; install new guard pickets and buffer rail at deck, replace bench, restore terrazzo, replace entrance enclosure; stair and navigation lighting replacement and underground utility replacement; rainwater leader replacement. no mechanical or fire protection scope. Questions Due Date: Jan 9th 2023, 3:00 PM EST

Bid Results

Playgrounds / Parks / Athletic Fields

$98,445.00

Public - County

Renovation, Site Work

13

26

15

4

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work Covered by Contract Documents, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Fabricator Qualifications, Temporary Facilities and Controls, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Fencing, Temporary Controls, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Lead Remediation
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications, Decorative Metal
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Backer Rods
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Tiling, Paver Tiling, Flooring, Terrazzo Flooring, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Other Specialties, Scales
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Hangers and Supports for Plumbing Piping and Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Hangers and Supports for HVAC Piping and Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Fill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Ground Covers
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps, Manufacturing Equipment, Dies and Molds, Dies, Molds

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
119
Bidding Soon
1,021
All Active Projects
482
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2023

February 17, 2023

img_map_placeholder

N Ridge Dr, Hampton Township, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

North Park Water Tower Restoration

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.