BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Ridgefield Park, New Jersey. Completed plans call for the renovation of a educational facility.

A. The Contract Documents are prepared in accordance with available information as to existing conditions and locations. If, during construction, conditions are revealed at variance with the Contract Documents, notify the Architect immediately so that supplementary instructions may be issued. B. The Specifications determine the kinds and methods of installation of the various materials, the Drawings establish the quantities, dimensions and details of materials, the schedules on the Drawings give the location, type and extent of the materials. C. Should the Drawings, Specifications or schedules disagree in themselves or with either or both of the others, the better quality or greater quantity of work or materials shall be performed and provided, unless otherwise directed in writing by the Architect. D. Dimensions given on the Drawings govern scale measurements and large scale drawings govern small scale drawings, except as to anything omitted unless such omission is expressly noted on the larger scale drawings. E. The techniques or methods of specifying to record requirements varies throughout text, and may include prescriptive, open generic/descriptive, compliance with standards, performance, proprietary, or a combination of these. The method used for specifying one unit of work has no bearing on requirements for another unit of work. F. Whenever a material, article or piece of equipment is referred to in the singular number in the Contract Documents, it shall be the same as referring to it in the plural. As many such materials, articles or pieces of equipment shall be provided as are required to complete the work. G. With the approval of the Architect and without additional cost to the Owner, the Contractor shall make all necessary changes or modifications to locations as may be necessary to suit requirements and conditions at the building and for the proper and conveniently accessible location of all parts of the system. H. Small details not usually shown or specified, but necessary for the proper installation and operation of the work, shall be provided. I. Cap all incomplete lines, ducts, conduits, openings, etc., until ready for final connection, after which they shall be thoroughly cleaned and left unobstructed. Sealed bids will be received for the following contract: 1. Overall Single Prime (all of the work) Questions regarding bidding should be directed to the Architect's office. Solutions Architecture Corp. bidding@solutions-arch.com 0: 973.484.4800 f: 201.706.7777 96 Pompton Ave. 2nd Fl. Verona, NJ 07044 All technical questions, comments, and inquiries should be directed to Solutions Architecture; the last day for questions is January 3rd, 2023. Bids shall be made on the Forms of Proposal provided and must be accompanied by bid security in the amount, form and subject to the conditions provided in the Instructions to Bidders. Each bidder shall submit with its bid, a Certificate of Consent of Surety as per N.J.S.A. 18A:18A-25 from a Surety company stating that it will provide the bidder and all subcontractors, if successful, with a performance/payment bond in the full amount of the contract. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. N.J.S.A. 18A:-18A-36(a). The owner reserves the right to reject any or all bids or to waive informality in the bidding if it is in the best interest of the Owner to do so and to award contracts only to those whose proposal is deemed by the Owner to be most advantageous to the interest of the public. Attention of Bidders is particularly called to the requirements of employment and minimum wage rates to be paid under the Contracts pursuant to N.J.S.A. 34:11-56.25 et seq. Pursuant to the "Public Works Contractor Registration Act" (P.L. 1999, c.238), bidders and their subcontractors must be registered with the New Jersey Department of Labor and Workforce Development. Bidders must comply with the requirements of "The Law Against Discrimination," set forth at N.J.S.A. 10:2-1, et seq., and Affirmative Action, set forth at N.J.S.A. 10:5-31, et seq., and N.J.A.C. 17:27-1.1 et seq. Pursuant to N.J.A.C. 6A:23A-6.3(a) (4), bidders must submit an executed C.271 political contribution disclosure form in accordance with the requirements of N.J.S.A. 19:44A-20.26. O. Bidders and subcontractors identified in the bid must be registered with the New Jersey Department of Treasury, Division of Revenue, and possess a Business Registration Certificate. If the bid exceeds $20,000.00, all bidders shall pre-qualify as required by the State of New Jersey, Department of the Treasury, Division of Property Management and Construction, and each bid shall be accompanied by an affidavit so certifying pursuant to N.J.S.A. 18A:1832. All inquiries concerning prequalification should be directed to Division of Property Management and Construction, Taxation Building, 8th Floor, West State and Willow Streets, Trenton, New Jersey 08625. 1. Bidders shall be prequalified in Categories C030, C032, C047 AND EITHER C008 OR C009. Bidding shall be in conformance with the applicable requirements of N.J.S.A. 18A:18A-1 et seq. concerning Public School Contracts Law.

Award

Educational

$1,484,800.00

Public - City

Renovation

34

17

5

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
512
Active Projects
240
Bidding Soon
4,653
All Active Projects
2,139
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2023

June 26, 2023

img_map_placeholder

1 Ozzie Nelson Dr, Ridgefield Park, NJ

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.