BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Eastport, Maine. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

Improvements will be made on Old Toll Bridge Road for demolition and reconstruction of approximately 700 feet of roadway and construction of an open bottom concrete crossing in place of an existing culvert. Work to include excavation, placing and grading of fill material to raise the road grades, construction of gravel base, placement of pavements, installation of piping, placement of drainage, seeding and mulching, riprap protection on the roadside slopes, paving of approximately 700 feet, guardrail, and required erosion control measures. A certified check or bank draft payable to the City of Eastport or a satisfactory bid bond executed by the bidder and surety company in the among equal to five percent (5%) of the bid shall be submitted with each bid. The successful bidder will be required to provide a contract performance surety bond and a contract payment surety bond, each for 100 percent of the contract price. No bid may be withdrawn for at least 60 days after receipt of bids unless released by the City of Eastport. The project is entirely or partially funded with CDBG funds through the State of Maine Department of Economic and Community Development Maine Decision Number ME20210027. The bidder's attention is called to the Federal Conditions, Federal Labor Standard Provisions and the Wage Rate Schedule included in these contract documents. Should a discrepancy exist between the Supplemental Federal Conditions, Federal Labor Standard Provisions and the Wage Rate Schedule and the other sections of the contract documents, the Supplemental Federal Conditions, Federal Labor Standard Provisions and Wage Rate Schedule shall apply. The "State of Maine, Department of Transportation, Standard Specifications, Revision of March 2020" and Portland Water District Construction Specifications will govern all work. The owner reserves the right to reject any and all bids, to waive any and all informalities and to negotiate contract terms with the successful bidder, and the right to disregard all non-conforming, non- responsive or conditional bids. Discrepancies between words and figures will be resolved in favor of words. Completion Date: August 30, 2023 - Surface Pavement Complete September 30, 2023 - substantial completion.

Post-Bid

Roads / Highways

$600,000.00

Public - City

Paving, Site Work

8

9

2

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
3
Bidding Soon
89
All Active Projects
29
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2023

February 13, 2023

img_map_placeholder

Old Toll Bridge Rd, Eastport, ME

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.