Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 25, 2023 at 8:00 PM
Updated January 26, 2024
Site work and paving for a road / highway in Billings, Montana. Completed plans call for site work for a road / highway; and for paving for a road / highway.
As of April 25 the project was awarded to JEFFERY CONTRACTING LLC for $13,170,594.81. NHFP 90-4(82)211 - Pavement Preservation project to mill and fill full width the I-90 eastbound and westbound lanes, interchange ramps, crossroads at the Gregson Interchange, Ramsay Interchange and Nissler Junction to a depth of 0.20ft. and replaced with 0.20 ft. plant mix surfacing. This project will also include a seal and cover, bridge work, MASH compliant guardrail, rumble strips, new cattleguards, pavement markings and updated signing. The project is located 4.2 miles west of Butte on I-90. The project begins west of the Fairmont Interchange (RP 211.1) and proceeds 8.5 miles east to the Nissler Interchange (219.2). HSIP STWD (657) - Nissler Interchange - NB to WB loop ramp (121.6 to 121.95): replace existing speed advisory sign with solar powered radar speed feedback sign, install linear delineation on barrier in curve. WB to SB ramp: install chevrons and shoulder rumble strips through curve. This project is under the jurisdiction of the Butte District Administrator. Uniform No. 9465000, 9465000 MTDOT - 101 - Gregson Interchange - Nissler Interchange
Award
Roads / Highways
$13,170,595.00
Public - State/Provincial
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 9, 2023
April 10, 2023
I-90, Billings, MT
Related To This Project
Billings, MT
Bid Date: Dec 20 2022
Billings, MT
Bid Date: Dec 13 2022
Billings, MT
Bid Date: Dec 14 2022
Billings, MT
Bid Date: Apr 14 2022
Billings, MT
Bid Date: Apr 14 2022
Billings, MT
Bid Date: Mar 08 2022
Billings, MT
Bid Date: Apr 21 2022
Billings, MT
Bid Date: Mar 07 2022
Billings, MT
Bid Date: Dec 20 2022
Billings, MT
Bid Date: Jan 05 2023
Billings, MT
Bid Date: Jan 05 2023
Billings, MT
Bid Date: Jan 17 2023
Billings, MT
Bid Date: Dec 06 2022
Billings, MT
Bid Date: Dec 20 2022
Billings, MT
Bid Date: Dec 02 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
