EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 25, 2024 at 7:00 PM

Updated October 1, 2024

Renovation of a transportation facility in Elgin, Illinois. Working plans call for the renovation of a transportation facility.

Questions regarding this IFB shall be submitted via Bonfire by 4:00 p.m. on January 9, 2024. Bonfire will not accept questions after this time. Each bid must be accompanied by a bid bond of 5% of the total bid price. Payment and Performance Bonds each in the amount of 100 percent of the Contract Price, with a corporation surety satisfactory to Metra, will be required to assure performance of the Contract. Any attorney-in-fact who signs any bond must attach to each bond an effective copy of his power of attorney, the date of the bond specifically including such date within the authority conferred thereby. Metra reserves the right to accept any Bid, or any part thereof, or reject any and all Bids. Permits and licenses of any nature necessary for the prosecution of the work shall be secured and paid for by the Contractor. The Contractor shall give all notices required by and otherwise comply with all laws, ordinances, rules, and regulations, including the safety rules and regulations of Metra, bearing on the conduct of said Work. All disputes concerning the payment of prevailing wage rates or classifications shall be promptly reported to Metra for decision or, at the option of Metra, referral to the Secretary of Labor. The decision of the Secretary of Labor shall be final. Providing temporary power provisions throughout the course of the project to maintain service during yard business hours. Shutdowns shall be scheduled 10 business days in advance and shall occur outside of business hours. Include all premium time necessary. B. Business hours are considered 6AM-5PM CT. All trackwork and outages must take place outside of business hours. All other work can be completed during business hours. C. Replace existing Central Wayside Power Unit Substation with new Unit Substation with walk in enclosure. D. Shift locations of Wayside Power Boxes 2 and 6 to new locations. E. Provide new conductors to existing Wayside Power Cabinets. F. Demolish Panelboards for Wayside Power Boxes in Welfare Building and replace with North Wayside Power Switchboard in walk in enclosure. G. Associated sitework for complete installation of new systems.

Final Planning

Transportation Terminals

$300,000.00

Public - City

Renovation

45

12

2

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools, Special Structures, Fabricated Engineered Structures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, HVAC Fans, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Identification for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
315
Active Projects
179
Bidding Soon
2,566
All Active Projects
1,321
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2024

March 1, 2024

img_map_placeholder

109 W Chicago St, Elgin, IL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Construction Services for Elgin Yard Wayside Power Distribution Components Removal and Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.