BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 17, 2023 at 7:00 PM

Updated January 26, 2024

Renovation of a medical facility in Charleston, South Carolina. Completed plans call for the renovation of a medical facility.

On the third floor of the Ashley River Tower (ART), make the architectural and engineering systems renovations necessary to support the new CT Equipment that is being provided and installed by Siemens Medical Construction Cost Range: $100,000 to $300,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others

Award

Medical

$196,235.00

Public - State/Provincial

Renovation

22

14

2

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
81
Bidding Soon
763
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 10, 2023

February 9, 2023

Project location map

25 Courtenay Dr, Charleston, SC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.