BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Costa Mesa, California. Completed plans call for the renovation of a municipal facility.

California Construction Authority is Soliciting Bids From a, B, or C10 Licensed Contractors for the Following Public Works Project at the Oc Fair & Event Center in Costa Mesa, Ca: Material and Labor for the Installation of Automatic Transfer Switches, Docking Stations, Etc. Costa Mesa Building The Costa Mesa Building is 34,000 square feet exhibit building on the OC Fair. The building is fed 2000 amp (A) electrical service through a 200A metered main switchboard located in the electric room inside of the building. The building currently does not have any backup power connections. Prior to installing backup power connections, relocation of existing electrical would be required as its current location creates challenges for adding equipment into the electrical room. To add backup power connections to the Costa Mesa Building the following will be completed: o Installation of a 2000A ATS and docking station adjacent to the wall in electrical room o Connect the ATS to the switchgear using an 8 x 18 wireway o Installation of a housekeeping pad, as necessary o Integration of the ATS and docking station into the existing electrical system using o proper wire, conduit, and connections Huntington Beach Building/Santa Ana Pavilion - The Huntington Beach building is 19,572 square feet exhibit hall with added structure, the Santa Ana Pavilion, which covers the breezeway between Costa Mesa and Huntington Beach buildings. The Huntington Beach building and Santa Ana Pavilion are fed 2000A electrical service through a 2000A switchboard located at the west end of the Huntington Beach building. Both facilities currently do not have any backup power connections. To add backup power connections to the Huntington Beach building and Santa Ana Pavilion the following will be completed: o Installation of a new 2000A ATS and docking station behind gear against the wall on the new, raised pad o Connection of the ATS to the switchgear with 3R cable tray with 2000A line from main and 2000A load back to buss o Integration of the ATS and docking station into the existing electrical service using appropriate wire, conduit, and connections

Award

Municipal

$248,986.00

Public - State/Provincial

Renovation

6

7

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
241
Active Projects
113
Bidding Soon
2,422
All Active Projects
1,072
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2023

February 1, 2023

img_map_placeholder

To Be Determined, Costa Mesa, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.