BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Renton, Washington. Conceptual plans call for site work for a water / sewer project.

The project includes upsizing the existing storm system along the East Valley Rd between SW 29th St and SW 23rd St to reduce the risk of flooding. This storm system discharges into the SW 23rd St channel, which flows to Springbrook Creek. High tailwater, in this channel due to restrictions in the channel capacity at Lind Ave SW culvert and Olympic pipeline crossing, reduces the conveyance capacity of the storm system and increases the likelihood of flooding during large storm events. Improvements planned by WSDOT and the city as part of the SW 23rd St Drainage and Fish Passage Improvements may affect the conveyance capacity of the storm system along East Valley Road. As such, both project schedules are being coordinated. Project is included in the City of Renton's FY 2023-2028 Budget CIP. As of January 18, 2023, information regarding a design team or a general contractor is not available. Funding is anticipated in 2023/2024 and 2026.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$1,120,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
30
Bidding Soon
880
All Active Projects
380
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2023

img_map_placeholder

E Valley Rd, Renton, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.