Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 8, 2024 at 8:00 PM
Updated May 9, 2024
Site work and outdoor lighting for a playground / park / athletic field in Winnipeg, Manitoba. Completed plans call for site work for a playground / park / athletic field; and for outdoor lighting for a playground / park / athletic field.
Bid Bond 10% Performance Bond 50 % Labor and Materials Bond 50 % D3. SCOPE OF WORK D3.1 The Work to be done under the Contract shall consist of demolition of the existing park features as necessary, supply and installation of: underground storage tank and associated LDS renewal, soil cells, custom site furniture, custom privacy screen, custom lighting arbour, stage, granite seating boulders, lighting standards, electrical outlets, electrical cabinets, unit pavers, planting trees and shrubs. D3.2 The major components of the Work are as follows: (a) Demolition of existing walls, plinths, stairs including pile caps, surfacing, catch basins, and the removal of plant material. (b) Disconnection and removal of existing light fixtures (wall packs). (c) Disconnection and removal of existing subsurface drainage and irrigation components. (d) Excavation and grading as per drawing and specifications. (e) Supply and installation bottle filling station with service connections per manufacturer specifications. (f) Supply and installation soil cell system with LDS connection as per manufacturer specifications. (g) Supply and installation storage rank with LDS connection as per manufacturer specifications. (h) Supply and construction of tiered seating and raised planters including custom furniture per drawings and specifications. (i) Supply and construction of concrete surfacing per drawings and specifications. (j) Supply and construction of unit paver surfacing per drawings and specifications Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
Bid Results
Playgrounds / Parks / Athletic Fields
$3,266,650.00
Public - City
Outdoor Lighting, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 28, 2024
April 15, 2024
345 Portage Ave, Winnipeg, MB
Related To This Project
Winnipeg, MB
Bid Date: Dec 16 2022
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Apr 11 2022
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Apr 19 2022
Winnipeg, MB
Bid Date: Jan 09 2023
Winnipeg, MB
Bid Date: Dec 14 2022
Winnipeg, MB
Bid Date: Dec 14 2022
Winnipeg, MB
Bid Date: May 25 2023
Winnipeg, MB
Bid Date: Jan 12 2023
Winnipeg, MB
Bid Date: Jan 12 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
