BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in St Catharines, Ontario. Contact the soliciting agency for additional information.

This Request for Proposal (the "RFP") is an invitation by the Regional Municipality of Niagara ("Niagara Region") to prospective proponents to submit proposals for Regional Road 81 (King Street) Rehabilitation Schedule B Municipal Class Environmental Assessment, as further described in Section A of the RFP Particulars (Appendix B) (the "Deliverables"). This RFP is being issued to a subset of the Successful Roster Listing developed from Contract 2021-RFSQ-227 specifically Category 14. Project Background and Objective Regional Road 81 (King Street) is a major east/west roadway extending from the Niagara Parkway in the Town of Niagara-On-The-Lake to the west boundary between the Region of Niagara and the City of Hamilton. This project is being initiated to review road rehabilitation options including the addition of active transportation facilities, and to address the failing timber retaining wall system on King St from 19th Street to Brookside Drive. This Request for Proposal is for the engineering services required to prepare the Schedule B Municipal Class Environmental Assessment (MCEA) for the Regional Road 81 (King Street) Rehabilitation. The project limits are Regional Road 81 (King Street) from 19th Street to 23rd Street, in the Town of Lincoln, a length of approximately 2 km (Appendix D)[NA1] . The project is situated in the communities of Jordan and Vineland, in the Town of Lincoln, and provides access to residential, commercial, and recreational uses. Part of the study area includes the Jordan Hollow, which is part of the Twenty Valley, that is designated as a Life Sciences Area of Natural and Scientific Interest. The average annual daily traffic of within the study area was 6400 in 2020. The Niagara Region Transportation Master Plan (TMP) sets out the strategic vision for transportation in the Niagara Region over the next twenty-five (25) years. As Niagara Region implements its future growth plan outlined in How We GROW, the TMP ensures that Niagara Region plans and budgets for future transportation needs for an integrated network of cycling and pedestrian facilities, transit, roads, and highways. The TMP also recommends an updated and expanded set of policies to guide future transportation and land development decisions. The major components of the TMP are: the Regional Road System; Transportation Demand Management; Transportation Systems Management; Public Transit; Active Transportation; Complete Streets; and Goods Movement. Niagara Region is committed to implementing the overall goals of the TMP as part of its transportation capital projects. Inspections have been carried out on the existing timber retaining wall, and based on the Retaining Wall Evaluation Report a recommendation was made to replace sections of the retaining wall in 1-5 years. In order to strengthen the failing timbers and stabilize the slope temporary repairs were undertaken in 2020 and are being undertaken 2022. A Schedule C MCEA was completed in 2022 for the replacement of the Twenty Mile Creek Arch Bridge. The bridge replacement project includes a multi-use path over the structure, and is scheduled for construction in 2023 and 2024. The Town of Lincoln is undertaking a revitalization project for the Jordan Hollow Park which will be completed as part of the bridge replacement construction works. The Town of Lincoln is also undertaking municipal improvements within the community of Jordan that includes active transportation facilities. Active transportation facilities identified in this project will tie the proposed facilities in Jordan to the Jordan Hollow Park, businesses and residences in Jordan Hollow, and to the community of Vineland. This design assignment is scheduled for 2023, and construction of the works is scheduled for 2025. Please refer to Section A of the RFP Particulars (Appendix B) for a detailed description of the deliverables, material disclosures, and mandatory requirements. Question Deadline: Tue Jan 10, 2023 12:00:00 PM (EST) Duration in months: 23 The method of contractor selection has not been determined at this time.

Conceptual

Roads / Highways

Public - County

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
446
Active Projects
257
Bidding Soon
4,140
All Active Projects
1,688
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 18, 2024

img_map_placeholder

Niagara Regional Rd 81, St Catharines, ON

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.