Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 12, 2025 at 7:00 PM
Updated November 13, 2025
Demolition, site work, paving, outdoor lighting and new construction of a civil project in Woodstock, Illinois. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and for outdoor lighting for a road / highway.
As of November 12, 2025, project has been awarded. Qualifications are requested for Phase II Engineering Services for the Bull Valley Road Multi-Use Path and Bridge project within the County of McHenry. McHenry County Division of Transportation desire to contract with a qualified engineering firm to assist the County of McHenry in Phase II Engineering for the construction of a multi-use path along the north side of Bull Valley Road from the Prairie Trail to Illinois Route 31 in the City of McHenry, widening Bull Valley Road at the Prairie Trail to add a median refuge island, constructing a new bridge over a tributary to the Fox River east of Ridgeview Drive, and installation of roadway lighting from Cunat Drive to Green Street. All work shall conform to IDOT/FHWA policies and procedures for federal aid projects and will be completed under applicable BLR and BDE Manuals. A Phase I Re-Evaluation may be required as part of this project. Experience with Phase I Re-Evaluations with IDOT Local Roads is desired. Coordination with the Union Pacific Railroad (UPRR) and the ICC will continue through PH II for new roadway and trail crossings. Experience working with UPRR and ICC is desired. December 19, 2022 Vendor Questions Submitted no later than 12:00 PM (CST) Submit by E-Mail to DMLEONARD@MCHENRYCOUNTYIL.GOV December 22, 2022 Vendor Questions Answered no later than 4:00 PM (CST) Posted to the County Website as an Addendum January 16-27, 2023 County Staff Review TBD Interviews before Selection Committee, if applicable April 18, 2023 County Board Approval of Selected Consultant (Anticipated) May 1, 2023 Project Starts (Anticipated)
Award
Bridges / Tunnels
$5,500,000.00
Public - County
Demolition, New Construction, Outdoor Lighting, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2023
Multiple Locations, Woodstock, IL
Related To This Project
Woodstock, IL
Bid Date: Mar 09 2022
Woodstock, IL
--
Woodstock, IL
--
Woodstock, IL
--
Woodstock, IL
Bid Date: Mar 04 2022
Woodstock, IL
Bid Date: May 06 2022
Woodstock, IL
--
Woodstock, IL
--
Woodstock, IL
Bid Date: Jan 10 2023
Woodstock, IL
--
Woodstock, IL
--
Woodstock, IL
Bid Date: Jul 10 2019
Woodstock, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
