BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 12, 2025 at 7:00 PM

Updated November 13, 2025

Demolition, site work, paving, outdoor lighting and new construction of a civil project in Woodstock, Illinois. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and for outdoor lighting for a road / highway.

As of November 12, 2025, project has been awarded. Qualifications are requested for Phase II Engineering Services for the Bull Valley Road Multi-Use Path and Bridge project within the County of McHenry. McHenry County Division of Transportation desire to contract with a qualified engineering firm to assist the County of McHenry in Phase II Engineering for the construction of a multi-use path along the north side of Bull Valley Road from the Prairie Trail to Illinois Route 31 in the City of McHenry, widening Bull Valley Road at the Prairie Trail to add a median refuge island, constructing a new bridge over a tributary to the Fox River east of Ridgeview Drive, and installation of roadway lighting from Cunat Drive to Green Street. All work shall conform to IDOT/FHWA policies and procedures for federal aid projects and will be completed under applicable BLR and BDE Manuals. A Phase I Re-Evaluation may be required as part of this project. Experience with Phase I Re-Evaluations with IDOT Local Roads is desired. Coordination with the Union Pacific Railroad (UPRR) and the ICC will continue through PH II for new roadway and trail crossings. Experience working with UPRR and ICC is desired. December 19, 2022 Vendor Questions Submitted no later than 12:00 PM (CST) Submit by E-Mail to DMLEONARD@MCHENRYCOUNTYIL.GOV December 22, 2022 Vendor Questions Answered no later than 4:00 PM (CST) Posted to the County Website as an Addendum January 16-27, 2023 County Staff Review TBD Interviews before Selection Committee, if applicable April 18, 2023 County Board Approval of Selected Consultant (Anticipated) May 1, 2023 Project Starts (Anticipated)

Award

Bridges / Tunnels

$5,500,000.00

Public - County

Demolition, New Construction, Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
544
Active Projects
294
Bidding Soon
3,874
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2023

Project location map

Multiple Locations, Woodstock, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.