Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a transportation facility in Houston, Texas. Conceptual plans call for site work for a transportation facility.
The Smart Railroad Crossing Monitor is a project for the identification and testing of solutions that support the collection of live video feeds and analytical data at critical crossings that impact emergency response, general city services, and mobility. The objectives of this project are to implement a cause-and-effect methodology for blocked crossing events, establish a threshold for alerting Houston Emergency Services and recommend data-sharing mechanisms to improve city workflow. This project has deployed over a dozen monitoring devices and other related equipment, creating a complex and dynamic system infrastructure. A sustainment design that "maps out" installation and system architecture is recommended. The deployed monitoring kits vary in design and previous and future installation services consisting of "as built" documentation will ensure functionality, and sustainment reducing the cost of maintenance and upkeep as the system grows. The next phase of the installation process should have an additional scope of work that provides technical documentation on what has been deployed and is being deployed, the type of data transport, and how the system will integrate into city workflow. As part of an additional installation request, the current service contractor is being asked to provide the following additional services: Equipment Installation - provide servicesthat include equipment built, testing, and installation of up to 10 railroad crossing monitors Installation Dynamics - provide the following plans and processes for sustainment and network integration: o Technical documentation on the network design of what has been deployed and is being deployed o "As Build" Drawings to support maintenance and troubleshooting operations o Project plans to support network scalability o Develop a product standard and communication workflow based on the current installation to ensure proper connection and functional requirements The method of Contractor Selection has not been Determined at this time
Conceptual
Transportation Terminals
$500,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 1, 2025
Multiple Locations, Houston, TX
Related To This Project
Houston, TX
--
Houston, TX
Bid Date: Jan 25 2023
Houston, TX
--
Houston, TX
Bid Date: Jan 10 2023
Houston, TX
Bid Date: Jan 11 2023
Houston, TX
Bid Date: Jan 18 2023
Houston, TX
Bid Date: Dec 19 2022
Houston, TX
--
Houston, TX
Bid Date: Jan 06 2020
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.