BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in London, Kentucky. Contact the soliciting agency for additional information.

This document constitutes a Request for Proposals for a Professional Service Contract from qualified individuals and organizations to furnish those services as described herein for the Commonwealth of Kentucky, Department of Highways. Item No. - 11-181.00 Project Manager - Keenan Jones, P.E. User Division - Planning Central Office Liaison - Brent Sweger, P.E. Approximate Fee - $250,000 Planning Study (Lump Sum) Project Funding - State Planning & Research (Federal Funds) Project Length - Approximately 3.144 miles Address congestion, access management, and safety issues on US25 North from Hal Rogers Parkway near KY State Police Post to KY490. (MP 13.5-16.7) The objective of this study is to identify and evaluate potential options to improve safety and mobility on US-25. The study will identify and screen a range of concepts including access management and potential geometric modifications at intersections. It will take a Complete Streets approach, identifying facilities that will safely support all appropriate users. The recommendations of this study will be organized into prioritized list of potential incremental improvements. The Consultant team shall include a DBE Participation Plan with their Response to Announcement to help the Department meet the 11.95% DBE goal established by FHWA. The plan should demonstrate how DBE companies will be mentored or used to assist in the area(s) pertaining to this contract. Opportunities for firms to be mentored on how to receive DBE and/or prequalification status may be available. An additional page will be allowed in the Project Approach (Section 7) to exhibit this plan. A maximum of five (5) points will be considered in the Evaluation Factors for the DBE Participation Plan. First Selection Meeting: January 17, 2023 Final Selection: February 1, 2023 Pre-Design Conference: February 8, 2023 Consultant Fee Proposal: February 17, 2023 Contract Negotiations: March 1, 2023 Notice to Proceed: March 22, 2023 The method of contractor selection has not been determined at this time.

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
39
Bidding Soon
413
All Active Projects
181
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2023

img_map_placeholder

US-25, London, KY

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.