BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Worcester, Massachusetts. Completed plans call for site work for a water / sewer project.

**As of  February 14, 2023 this project has not yet been awarded. A timeline or award has not yet been established.**  The Massachusetts State College Building Authority (the "MSCBA") hereby requests bids from General Contractors interested in bidding for the Work described herein pursuant to the requirements of M.G.L. c. 30, 39M and all other applicable provisions of the Massachusetts General Laws. If it be in the best interest of the MSCBA to do so, the MSCBA reserves the right to reject any and all Bids, to waive any informalities or minor deviations, to cancel the project and Bid Documents at any time prior to award, and/or to advertise for new Bids if funds are not available for the Project. These instructions provide Bidders with information intended to enable them to prepare and submit Bids for consideration and evaluation by the MSCBA. These instructions cover all work as documented in the attached bid documents, as modified by addenda, if any (collectively, the "Bid Documents"). Scope- Improvements to existing underground heating hot water manholes and manhole piping, including valves, waterproofing, and piping insulation, and other Work indicated in the Contract Documents. Worcester State University located at 486 Chandler Street Worcester, MA 01602 Question/Clarification Period closes Thursday, January 12, 2023 at 5:00 pm On-Site Construction Start: May 8, 2023 Substantial Completion: July 18, 2023 Final Completion: August 25, 2023 Bid Deposit. Each bid must be secured by an accompanying deposit of five percent (5%) of the total amount of the Bid. Deposits shall be in the form of a bid bond, or a certified check, treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Massachusetts State College Building Authority. No cash will be accepted. Bid deposits of all Bidders, except those of the three lowest responsible and eligible Bidders, will be returned within five (5) business following the Bid opening. Except as provided in the "BONDS AND INSURANCE CERTIFICATES" and "FOREIGN CORPORATION" sections appearing below, the Bid Deposits of the three lowest responsible and eligible bidders will be returned upon the execution of the Contract or, if no award is made, upon the expiration of the time prescribed for making an award. Estimated construction cost is $500,000 Minority Participation Goal: 15.3% Women Participation Goal: 6.9%

Bid Results

Water / Sewer

$713,500.00

Public - State/Provincial

Site Work

12

19

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
351
Active Projects
181
Bidding Soon
3,274
All Active Projects
1,356
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2023

May 8, 2023

img_map_placeholder

486 Chandler St, Worcester, MA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.