BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in Wauwatosa, Wisconsin. Completed plans call for the renovation of a residential development.

The project contemplated herein consists of the Contractor replacing the 12 power wires and associated control wiring to all four valves from the control building CT01 to the bottom of the Northwest Service Relief Tunnel. All contractor and subcontractor employees shall obtain specific site plant safety training from Veolia Water prior to working on the site. Veolia Water will offer a total of two one-hour training sessions to the contractor and any subcontractors. The Contractor shall adhere to all Veolia Water safety policy and procedures. Bid packages for furnishing all plant labor, equipment, materials and performing all work necessary for this project. Bid results may be publicly viewed, Wednesday, January 18, 2023 no later than 2:30 p.m., electronically or the Veolia Procurement Office, 1st Floor, Maintenance Building #280, located at the Jones Island Water Reclamation Facility, 700 East Jones Street, Milwaukee, WI 53207. Questions pertaining to the proposed work should be directed to David Perry, (414) 378-9911. The time for completion of the Contract shall be one hundred twenty (120) days from the date of Notice to Proceed. Veolia Water reserves its rights to reject any Bid, to reject all Bids, and any bid not conforming to the intent of the invitation for bids and to postpone the award of the Contract for a period of time not exceeding one hundred twenty (120) days from the bid opening date. Bids shall remain firm and may not be withdrawn during this one hundred twenty (120) day period. Veolia Water reserves its rights to waive any informality or deficiency in any Bid, to accept any Bid, to negotiate modifications of any Bid with any Bidder and accept any modified Bid, and to rebid the Project, all at Veolia Water's sole discretion. All interested bidders should direct their questions about the pre-bid meeting to barbara.brown2@veolia.com or call 414-747-3852 or information concerning the proposed request for bid or any other questions, please contact me at (414) 747-3852 or David Perry at (414) 378-9911. Veolia Water/MMSD participation goals for SWMBE are: Minority-owned Business - 13% Small Business/Veteran-owned Business - 5% Women-owned Business - 2% The overall SWMBE goal is twenty (20) percent The power and associated control wires to four valves at the CT01 control station are in need of replacement. The power and control wires that shall be replaced run from the control building down to the Northwest Side Remote Storage (NWSRS). The existing wiring extends to the valve pit through multiple 2" conduit. Only two of the four sets of power wires are not operating properly and are not opening valve #2 (FV-120) and valve #3 (FV-130). Since it is impractical the remove only these two bundles of damaged wiring from the conduit, all four groups of wiring shall be replaced. The control wires for the valves are just as old as the power wires, and therefore will be replaced during this process as well.

Bid Results

Residential Subdivision

$55,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
234
Active Projects
110
Bidding Soon
2,679
All Active Projects
987
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 18, 2023

February 17, 2023

June 17, 2023

img_map_placeholder

8950 W Watertown Plank Rd, Wauwatosa, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.