Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Boucherville, Quebec. Contact the soliciting agency for additional information.
The purpose of this document is to provide a description of the services the Contractor must supply throughout the duration of this project and to outline the content and format of the required deliverables. Additionally, the document specifies key team member's roles and responsibilities. National Research Council Canada Regional Building Condition Assessment (BCA) Program The National Research Council Canada (NRC) is in need of building condition assessments to evaluate the current condition of six of its real property assets. The properties in need of assessment are: Buildings BOU-1, BOU-2, BOU-3, BOU-5, 75 boulevard de Mortagne, Boucherville, QC J4B 6Y4 ,; Buildings SAG-1, SAG-2, SAG-3, 501 boulevard de l'Universite est, Saguenay, QC G7H 8C3; These assessments are part of Real Property Planning and Management's (RPPM) on-going efforts to determine the most appropriate management strategy for the retention, maintenance and/or rehabilitation/renewal of the site, buildings and building elements in order to satisfy the Government of Canada's (GoC) current and future requirements as they relate to their Science Assets. Given the significant investment required to recapitalize these assets, the importance of a repeatable, rigorous, analysis of the inventory, including condition assessment, financial, utilization and adequacy, is critical to the ongoing life-cycle management of these assets. Building Condition Assessments provide foundational, detailed, technical information on which these analyses are based. The Building Condition Assessment process is used to assess the physical condition of real property assets. The intent is to generate building condition information that enables capital planning for rehabilitation, renovation and replacement based on objectively applied criteria of condition. For each building, the Building Condition Assessment must include the following information: the general characteristics of a site, building and building elements; history of additions, renovations or major system improvements; condition rating of building elements such as structure, building envelope, electrical, and mechanical systems; comments on maintenance requirements; comments on essential corrective/remedial requirements; information on the life-cycle capital cost of refurbishment or replacement of building elements; information on the current replacement value (CRV) or replacement cost new (RCN) of each building, including major group elements (ASTM Uniformat II Level 1), group elements (ASTM Uniformat II Level 2), individual elements (ASTM Uniformat II Level 3), and sub-elements (ASTM Uniformat II Level 4). See Appendix A; and capital cost plans presented on a yearly basis for work over the next 25 year life-cycle of the buildings and elements. The objective of a Building Condition Assessment is to investigate various building and site improvement factors including: Element condition and assessment of remaining service life (ASTM Uniformat II Levels 1 through 4). See Appendix A; Building equipment obsolescence; Design problems and deficiencies that adversely affect operation and maintenance activities; Compliance with the current applicable standards & codes (i.e. latest edition/revision) and propose remedial work; Effective age and remaining service life of building elements; Facility Condition Index for the building; and Recommendations on the underground assets (i.e. linear assets). The method of contractor selection has not been determined at this time.
Conceptual
Municipal
Public - Federal
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
1
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 15, 2023
Multiple Locations, Boucherville, QC
Related To This Project
Boucherville, QC
Bid Date: Mar 24 2022
Boucherville, QC
Bid Date: Apr 11 2022
Boucherville, QC
Bid Date: Mar 24 2022
Boucherville, QC
--
Boucherville, QC
Bid Date: Mar 21 2022
Boucherville, QC
Bid Date: Mar 24 2022
Boucherville, QC
Bid Date: May 02 2022
Boucherville, QC
Bid Date: Dec 12 2022
Boucherville, QC
Bid Date: Nov 23 2022
Boucherville, QC
Bid Date: Jan 16 2023
Boucherville, QC
Bid Date: Nov 10 2022
Boucherville, QC
Bid Date: Oct 24 2022
Boucherville, QC
Bid Date: Oct 27 2022
Boucherville, QC
Bid Date: Nov 07 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.