BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Burlington, Washington. Conceptual plans call for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The City of Burlington is seeking qualifications from design and engineering consultants capable of developing a conceptual framework and preliminary civil engineering utility design leading to the redevelopment of Maiben Park. The site covers an entire city block, is flat, and well drained and is located at 1011 Greenleaf Avenue in Burlington, WA. The Park currently houses the City’s Community and Senior Center, basketball and tennis courts, a small home repurposed into a public meeting space and a grove of old growth trees, none of which are slated for alteration. The City does wish to redevelop the remainder of the Park to possibly include the following: ? Installation of two covered and lighted Pickleball courts ? Demolition of one tennis court and rebuild (possibly in new location) ? Removal of the existing bathroom and replacement with two separately located units ? Installation of a Natural Playground or similar structure ? Removal and possible replacement of the water spray area The scope of services include the following: ? Formulation of up to three Park improvement conceptual layouts ? Preliminary civil design (utilities) to support improvement plans ? Estimation of approximate park improvement costs Questions can be directed to Marv Pulst at: 360-755-1334 360-982-8677 (cell) Marvp@burlingtonwa.gov Following is the tentative timetable for this RFQ: 1. Publication of Request for Qualifications (RFQ) May 15, 2023 2. Proposals due from interested Consultants 3:00 p.m. Wednesday, June 7th 3. Selection of awarded Consultant Wednesday, June 14, 2023 4. Signed agreement due from Consultant Wednesday, June 21, 2023 5. Approval by City Council Thursday, June 22, 2023 6. Notice to proceed Monday, June 26, 2023 The submittal of qualifications indicates that the Consultant can comply with this timetable. The City reserves the right to reject any and all proposals, to waive any irregularity or informality in a proposal, and to accept or reject any item or combination of items, when to do so would be to the advantage of the City. It is also within the right of the City to reject responses that do not contain all elements and information requested in this RFQ.

Conceptual

Playgrounds / Parks / Athletic Fields

$440,000.00

Public - City

New Construction, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
60
Bidding Soon
1,904
All Active Projects
704
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2023

img_map_placeholder

1011 Greenleaf Ave, Burlington, WA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.