BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Aurora, Illinois. Completed plans call for the renovation of a educational facility.

Sealed bids for the Summer 2023 Roofing Improvements at West Aurora High School, Washington Middle School, and Smith Elementary School Project Locations: The Project consists of fluid applied roof coating on existing single ply membrane roofing and repairs of existing roofing elements and new fluid applied roof coating membrane on existing EPDM at West Aurora High School, 1201 West New York Street; Washington Middle School, 231 Constitution Drive; and Smith Elementary School, 1332 Robinwood Drive; all in Aurora, IL Each bid must be accompanied by a Bid Guarantee in the form of a Bid Bond, Certified Check or Bank Draft in an amount equal to and not less than ten percent (10%) of the bid and made payable to "West Aurora School District #129." No bid shall be withdrawn for a period of sixty (60) days after the bid opening date without the consent of the Owner. Checks or drafts of unsuccessful Bidders will be returned as soon as practical, after opening and checking the bids. Successful Bidder must provide a Performance Bond and a Labor and Material Payment Bond in the full amount of the Contract, acceptable to the Owner. The Board of Education reserves the right to reject any or all bids or parts thereof or waive any irregularities or in formalities in bidding. This Contract is subject to the Illinois Prevailing Wage Act (820 ILCS 130/1 et seq.). QUALIFICATION: Each Bidder must satisfactorily complete the qualification process described in Section 004395 -General Requirements of the Project Manual, by providing the required Qualification Documents. The required Qualification Documents must be delivered along with the Bidder's sealed bid at the same place and time required for the bid. Contents of each Bidder's Qualification Documents will be available for public review. here shall be only bvgone scheduled walk-through of the site. Attendance shall be taken at the site to ensure that all contractors have visited the site. Non-attendance can be grounds for rejection of bid.

Award

Educational

$3,235,375.00

Public - County

Renovation

18

10

10

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
91
Bidding Soon
1,752
All Active Projects
761
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 4, 2023

May 30, 2023

img_map_placeholder

Multiple Locations, Aurora, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.