BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Moberly, Missouri. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of May 20, 2024, per owner, they anticipate construction in 2025. Waiting on a response from MoDOT regarding their proposed design exception, proceeding with utility coordination and field work for a cultural resource survey. A design team has been identified. Federal Aid No: JNE0002 Location: South Morley/Business 63, between East Burkhart St. and East Carpenter St. Proposed Improvement: Road widening/lane addition with pedestrian and drainage improvements Length: 1,630' Approximately Approximate Construction Cost: $2,976,886 DBE Goal Determination: 5% The method of contractor selection has not been determined at this time. Any questions regarding the project may be submitted to the City to the attention of the project contact listed in the attachment. We request any questions be submitted no later than 12:00 PM local time on Sept. 30th, 2022 MODOT - RFQ Engineering - Cost Share South Morley/ Bus 63 Burkhart Street to Carpenter Street

Design

Roads / Highways

$2,976,886.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
26
Bidding Soon
333
All Active Projects
144
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2025

img_map_placeholder

S Morley St & US-63 BUS, Moberly, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.