Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 16, 2022 at 7:00 PM
Updated January 26, 2024
Site work and paving for a mixed-use development in Adel, Missouri. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Job No: J1S3438 Location: Mercer and Putnam Counties, 65, M & E Proposed Improvement: Improvements along existing routes to include sidewalk repair /replacement, pedestrian ramp improvements, and other ADA deficiencies as outlined in MoDOT's Transition Plan. Length: 3.606 (lane) miles Approximate Construction Cost: $2,163,000 DBE Goal (if applicable) 5% The method of contractor selection has not been determined at this time. MODOT - RFQ Engineering - Wheeling, Improvements Along Existing Routes to Include Sidewalk Repair
Conceptual
Roads / Highways
$2,163,000.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
