Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 6, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a civil project in Henderson, Nevada. Conceptual plans call for site work for a water / sewer project.

Plans call to construct a second pipeline to convey water throughout the south end of the valley. The project includes the installation of about 30 miles of large pipe up to 10 feet in diameter (much larger than the pipelines or water mains you might find in the street outside your home). Two routes are under consideration. The south alignment would be constructed through mostly undeveloped areas of the valley, including tunneling underneath a portion of the Sloan Canyon National Conservation Area(Opens another site in new window). This is the Water Authority’s preferred alignment, as it would avoid significant disruption to streets in Henderson neighborhoods and economic impacts to the business corridors. As of April 6, 2023, this project is in the design phase. An engineer has been selected for the project. Per the owner, the timeline is being reevaluated and a firm timeline has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Conceptual

Water / Sewer

$2,000,000,000.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
29
Bidding Soon
705
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2024

Project location map

Multiple Locations, Henderson, NV

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed