BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 1, 2023 at 7:00 PM

Updated January 26, 2024

Renovation of a mixed-use development in Cheyenne, Wyoming. Completed plans call for the renovation of a educational facility.

Alta Vista Elementary School Remove all existing layers of the EPDM roof system, insulation, flashings, and metal flashings. Install new fully adhered EPDM roof system with new insulation, tapered insulation crickets, saddles and coverboard. Remove all HVAC units from curbs, flash curbs up and over the top, raise curbs as needed and reinstall HVAC units. When raising curbs extend all electrical, control wiring, plumbing, and duct work as needed. See plans for complete scope of work. Clawson Elementary School Remove all existing layers of the EPDM roof system, insulation, flashings, and metal flashings. Install new fully adhered EPDM roof system with new insulation, coverboard, wall flashings, curb flashings and new metal flashings. Remove all HVAC units from curbs, flash curbs up and over the top, raise curbs as needed and reinstall HVAC units. When raising curbs extend all electrical, control wiring, plumbing, and duct work as needed. See plans for complete scope of work. Fairview Elementary School Remove all existing layers of the PVC roof system, insulation, flashings, and metal flashings. Install new fully adhered EPDM roof system with new insulation, tapered insulation crickets, saddles and coverboard. Remove all HVAC units from curbs, flash curbs up and over the top, raise curbs as needed and reinstall HVAC units. When raising curbs extend all electrical, control wiring, plumbing, and duct work as needed. Repair roof area as indicated on the plans. See plans for complete scope of work. Johnson Junior High School Remove all existing layers of the ballasted EPDM roof system, insulation, flashings, and metal flashings and penetration flashings. Install new fully adhered EPDM roof system with new insulation, tapered insulation crickets, saddles and coverboard. Remove all HVAC units from curbs, flash curbs up and over the top, raise curbs as needed and reinstall HVAC units. When raising curbs extend all electrical, control wiring, plumbing, and duct work as needed. See plans for complete scope of work. East High School Remove all existing layers of the EPDM roof system, insulation, flashings, and metal flashings. Install new fully adhered EPDM roof system with new insulation, tapered insulation crickets, saddles and coverboard. Remove all HVAC units from curbs, flash curbs up and over the top, raise curbs as needed and reinstall HVAC units. When raising curbs extend all electrical, control wiring, plumbing, and duct work as needed. See plans for complete scope of work. Question Deadline 01/10/2023 at 12:00 PM MT Site Directions: Alta Vista Elementary 1514 East 16th Street East High School 2800 East Pershing Blvd. Fairview Elementary 2801 East 10th Street Johnson Junior High 1236 West Allison Road Clawson Elementary 376 Road 228A Horse Creek WY 82061

Award

Educational

$329,199.00

Public - County

Renovation

28

16

4

6

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
37
Bidding Soon
527
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2023

June 7, 2023

Project location map

Multiple Locations, Cheyenne, WY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.