Published February 13, 2023 at 7:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Williamsville, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of February 13, 2023, project was awarded to P.H. Broughton, awarded amount is $245,464.85.** This Project is to be constructed in two phases as follows: PHASE 1 WORK includes 22 units Tree Removal (Over 15 Units Diameter) 480 cu yd Earth Excavation 240 ton Aggregate Base Course 6 ton Aggregate Surface Course 93 sq yd Portland Cement Concrete Driveway Pavement 776 foot Concrete Gutter (Special) 54 pound Temporary Erosion Control Seeding 1 lump sum Trafic Control and Protection, (Special) Various other items to complete the work. PHASE 2 WORK includes 50 units Tree Removal (6 to 15 Units Diameter) 48 units Stump Removal Only 620 ton Aggregate Base Course 26 ton Aggregate Surface Course 395 pound Bituminous Materials (Tack Coat) 150 ton Hot-Mix Asphalt Binder Course 150 ton Hot-Mix Asphalt Surface Course 51 sq yd Portland Cement Concrete Driveway Pavement 379 foot Concrete Gutter (Special) 2,488 sq ft Portland Cement Concrete Sidewalk 574 sq ft Sidewalk Removal 0.3 acre Seeding, Class 1 (Special) 1 lump sum Trafic Control and Protection, (Special) Various other items to complete the work. Attention is called to the fact that only bid proposals that cover ALL THE WORK will be accepted and read aloud by the Village. Partial bids will not be accepted. Bid proposals shall be accompanied by data suficient for the Village to evaluate the bidders qualiications to do the work, including but not limited to a list of 3 projects for units of government similar in size, cost, and scope in which the Bidder was the prime contractor and completed in the past 5 years. References for such projects, including name, position, phone number and if available, e-mail address, shall also be provided with the proposal. Failure to supply the project information will be considered an incomplete bid proposal and withdrawn from consideration. Attention is called to the fact that this project is subject to the Illinois Prevailing Wage Law. The Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, or national origin. Furthermore, this contract is available to minority and women contractors. Bidders shall actively solicit minority and women subcontractors and shall maintain records of their solicitation process. Attention is called to the fact that this project is subject to the Public Construction Bond Act, 30 ILCS 550/1, and the successful bidder shall be required to provide a performance and payment bond in the amount of the contract in such form and manner as required by that Act. A certiied check or bank draft, payable to the Village of Williamsville, negotiable U.S. Government bonds (at par value), or a satisfactory Bid Bond executed by the Bidder and an acceptable Surety in an amount equal to Ten Percent (10%) of the total Bid shall be submitted with each Bid for each Contract.

Award

Roads / Highways

$245,465.00

Public - City

Paving, Site Work

53

4

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
52
Bidding Soon
462
All Active Projects
231
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2023

February 6, 2023

img_map_placeholder

Multiple Locations, Williamsville, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Richardson Subdivision Street Work Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.