Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Gorham, Maine. Completed plans call for the renovation of a 3,240-square-foot, one-story above grade educational facility.
Cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract. Coordinate the Work of this Contract with work performed under separate contracts. References to concurrent work included throughout the contract documents is intended to identify areas of potential overlap and conflict but does not necessarily capture all work under separate contracts. The Contractor shall coordinate fully with the Architect, Owner, and separate contractors prior to the commencement of work to identify all potential conflicts between separate contractors and to confirm scheduling requirements for a successful project completion. This Section includes the following: 1. Work covered by the Contract Documents. 2. Type of the Contract. 3. Work schedule. 4. Work under other contracts. 5. Use of premises. 6. Owner's occupancy requirements. 7. Work restrictions. 8. Specification formats and conventions. A. The intent of this section is to require the Contractor to provide qualified testing expertise to organize, schedule, coordinate, and perform functional performance testing prior to commissioning of buildings mechanical systems. B. The Commissioning Agent shall be contracted directly with the Owner. The Contractor shall coordinate with and provide assistance to the Commissioning Agent as described in this section. The Commissioning Agent shall be a Registered Professional Engineer in the State of Maine. The individual shall have close working knowledge of the systems (for example, the System Designer) in the building and shall be independent from the Installing Contractor. C. Provide the services of Subcontractors as appropriate in planning and performing testing and troubleshooting of equipment and systems as described in these specifications prior to and during the commissioning of the mechanical systems. D. Provide a complete commissioning of the HVAC systems, Plumbing systems, and the building envelope as applicable.
Post-Bid
Educational
$550,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 25, 2023
May 19, 2023
To Be Determined, Gorham, ME
Related To This Project
Gorham, ME
--
Gorham, ME
--
Gorham, ME
--
Gorham, ME
--
Gorham, ME
--
Gorham, ME
--
Gorham, ME
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.