BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Gorham, Maine. Completed plans call for the renovation of a 3,240-square-foot, one-story above grade educational facility.

Cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract. Coordinate the Work of this Contract with work performed under separate contracts. References to concurrent work included throughout the contract documents is intended to identify areas of potential overlap and conflict but does not necessarily capture all work under separate contracts. The Contractor shall coordinate fully with the Architect, Owner, and separate contractors prior to the commencement of work to identify all potential conflicts between separate contractors and to confirm scheduling requirements for a successful project completion. This Section includes the following: 1. Work covered by the Contract Documents. 2. Type of the Contract. 3. Work schedule. 4. Work under other contracts. 5. Use of premises. 6. Owner's occupancy requirements. 7. Work restrictions. 8. Specification formats and conventions. A. The intent of this section is to require the Contractor to provide qualified testing expertise to organize, schedule, coordinate, and perform functional performance testing prior to commissioning of buildings mechanical systems. B. The Commissioning Agent shall be contracted directly with the Owner. The Contractor shall coordinate with and provide assistance to the Commissioning Agent as described in this section. The Commissioning Agent shall be a Registered Professional Engineer in the State of Maine. The individual shall have close working knowledge of the systems (for example, the System Designer) in the building and shall be independent from the Installing Contractor. C. Provide the services of Subcontractors as appropriate in planning and performing testing and troubleshooting of equipment and systems as described in these specifications prior to and during the commissioning of the mechanical systems. D. Provide a complete commissioning of the HVAC systems, Plumbing systems, and the building envelope as applicable.

Post-Bid

Educational

$550,000.00

Public - State/Provincial

Renovation

32

16

38

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
42
Bidding Soon
794
All Active Projects
318
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.