Site work for a water / sewer project in Muscle Shoals, Alabama. Completed plans call for site work for a water / sewer project.

As of March 3, 2023, the project has not been awarded. A timeline for award has not been confirmed. In general, the project includes approximately 920 feet of 8" ductile iron water main, 370 feet of 8" PVC gravity sewer main, 3,090 feet of 4" ductile iron force main, new sewage lift station and associated site/electrical work. Proposals shall be accompanied by a bid bond or a cashier's check in an amount not less than five percent (5%) of the total bid price or $10,000 payable without recourse to the Muscle Shoals Utilities Board. Check or bid bond shall be provided as a guarantee that the Bidder will enter into a contract and execute performance and payment bonds within fourteen (14) days after Notice of Award. The successful bidder shall furnish a performance bond in the amount of 100% of the contract price and payment bond in the amount of 50% of the contract price upon the forms provided. Performance and Payment Bonds shall be from an approved surety company holding a permit from the State of Alabama to act as surety. This project is considered a "Public Works" project and is governed by competitive bid laws as contained in Title 39 (1997) of the Alabama Code. Bidders, subcontractors, suppliers, and Bond Agents should be familiar with this code. The attention of all Bidders is called to the provisions of State law governing "General Contractor", as set forth in ALA.CODE 34-8-1, et seq. (1975), and rules and regulations promulgated pursuant thereto. The Owner reserves the right to reject any or all bids, to waive irregularities in the bids and bidding deemed to be in the best interests of the Owner, and to reject non-conforming, non-responsive, or conditional bids. No Bidder may withdraw his bid within sixty days from the date set for receiving the bids. SCOPE: The Contractor shall furnish and install submersible non-clog sewage pumps with discharge connections, discharge base, 316 SS guide bards, 316 SS lifting chains, controls, and access hatches as specified herein and indicated in the Plans. B. REFERENCES 1. American Society for testing and material (ASTM) International a. A 48: Standard Specification for Gray Iron Castings. b. A743: Standard Specification Iron-Chromium Nickel, Corrosion Resistant, 2. American National Standards Institute (ANSI): a. B16.1: Standard for Cast Iron Pipe Flanges and Flanged Fittings, 125 lb. 3. Hydraulic Institute: Current Standards. a. HI 14.6: Hydrodynamic Pumps for Hydraulic Performance Acceptance Tests. b. HI 11.6: Submersible Pump Tests

Bid Results

Water / Sewer

$816,389.00

Public - City

Site Work

32

23

5

7

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Temporary Utilities, Construction Facilities, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Cold-Formed Metal Framing, Metal Fabrications
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Identification for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Circuit Protective Devices, Fuses
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Chain Link Fences and Gates
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors, Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
33
Bidding Soon
441
All Active Projects
229
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2023

March 9, 2023

img_map_placeholder

Counts Dr, Muscle Shoals, AL


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Counts Drive Water and Sewer Extension

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.