BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Union, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Interested parties are invited to submit a proposal to complete the below scope for the proposed )Missouri Eastern Railroad (MER) Union Rehabilitation project near Union, MO Scope of Work MER Union rehabilitation project will be completed between Mileposts 58 and 60.3 near Union, Missouri. Contractor will provide all necessary labor, equipment, materials and logistical support to complete all rehabilitation and track construction work. The scope is further described as follows: o Provide, extract, and install 3053 new 7x9x8-6 cross ties with OTM. o Provide, extract, and install 128 switch ties between 4 turnouts with OTM. o Provide and replace 2050 track feet of rail in Union West Pass with 115# or larger rail with matching OTM. o Provide and install 4071 matching rail anchors. o Provide and distribute 1214 tons of approved ballast. o Surface and Dress 26,094 track feet of track. o Provide and laydown asphalt black top on gravel roadway at West Transload Site. o Include any applicable taxes. o All work will be in accordance with AREMA Standards, ballast shoulders must be dressed at the end of each workday o Additional details concerning the scope of work will be addressed at the pre-bid meeting. Work Windows Impact to current railroad operations must be kept to a minimum. When work must take place that causes an active track to be taken out of service for the purposes of performing work that pertains to the project, the contractor must pre-arrange a defined work window with the railroad. Contractor can anticipate a minimum work window of (8) eight hours with no more than one scheduled interruption in that timeframe between the hours of 07:00 and 17:00. For work windows extending more than eight (8) hours, a minimum of seventy two (72) hours of notification is required to the railroad to arrange this window. Work windows may be arranged seven days a week, if desired. Current railroad operations consist of one (1) train per day through the work area. This schedule is subject to change at any time. All work pertaining to this project shall be completed by May 31, 2023. Failure to complete work by May 31, 2023 may result in the contractor's removal from the property or charges of $400 per calendar day until completed to satisfaction. The structure of your proposal must be clearly understood, all proposals shall provide the following line items and provide the costs as required below. 1. Provide total sum of all line items on the proposal 2. Mobilization and Demobilization - Lump sum 3. Provide, extract, and install 3053 7x9x8-6 crossties 4. Provide, extract, and install 128 switch ties between 4 turnouts with OTM. 5. Provide and replace 2050 track feet of rail in Union West Pass with 115# or larger rail with matching OTM. 6. Provide and install 4071 matching rail anchors. 7. Provide and distribute 1214 tons of approved ballast. 8. Surface and Dress 26,094 track feet of track. 9. Provide and laydown asphalt black top on gravel roadway at West Transload Site. 10. Include any applicable taxes. 11. Dispose of all crossties Work Reporting Daily work reports must be filled out and submitted to Wes Marshal, MER Roadmaster at wmarshall@jag-transport.com phone 573-315-6237 and Neal Jacobs, Division Engineer at njacobs@jag-transport.com phone 316-215-4087. Weekly reports should include updates to project schedules, any delays, or any change in scope of work. A detail summary report must be submitted at the completion of the project. Daily reporting shall consist of daily progress reports simultaneously emailed to Wes Marshall and Neal Jacobs. Further information or questions regarding the Request for Proposals, or submitting a proposal, need to simultaneously be emailed to Wes Marshall and Neal Jacobs.

Post-Bid

Roads / Highways

$244,000.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
51
Bidding Soon
885
All Active Projects
344
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2023

March 10, 2023

img_map_placeholder

To Be Determined, Union, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.