BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Toronto, Ontario. Contact the soliciting agency for additional information.

Upgrades to the Wirral Court and Brule Gardens Sewage Pumping Station (SPS). TIMELINE: A Request For Proposals has been issued by the owner. The awarded proponent will provide engineering services related to the Environment Assessment of the sewer systems including the Wirral Court Sewage Pumping Station (SPS) and Brule Gardens SPS. The engineer will: Collect and review background information and data required for this study; Update the network in the model based on the recent field investigations; calibrate and validate ICM or ICM SE model to assess flows from the drainage area into the Wirral Court Sewage Pumping Station (SPS) and the Brule Gardens SPS and identify capacity constraints in the pumping stations and sewer systems under existing and future development conditions. Develop and evaluate alternative solutions to comply with Toronto Water's design standard for capacity and flooding protection, MOECC Design Guidelines for Sewage Works, City of Toronto Design Criteria for Sewers and Watermains, Appendix I - Pumping Station and MOECC F-5-5 Procedure for water quality control. Work at the Brule Gardens SPS is provisional and will proceed at the City's discretion and is contingent upon on the continued good performance of the Supplier on the Wirral Court SPS location. Some considerations which will impact the decision include the quarterly Professional Services Performance Evaluations (PSPE) and that the progress of the Wirral Court Site at the 12-month mark is progressing satisfactorily against the proposed schedule. Select preferred solutions and provide a conceptual design for the preferred solutions for the pumping station, forcemain and the sewers for each SPS study Delivery Schedule for Goods or Services OR Contract Duration: 30 months, with 12-month option to extend. The method of contractor selection has not been determined at this time.

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
234
Active Projects
111
Bidding Soon
2,519
All Active Projects
1,014
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2023

img_map_placeholder

Multiple Locations, Toronto, ON


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.