Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Hartford, Connecticut. Completed plans call for the renovation of a educational facility.
The purpose of this Invitation to Bid ("ITB") is solicit bids for the Wired Access Layer Refresh (WALR): Hartford School of Law - Hosmer Hall & Knight Hall project for construction services Q&A (RFI) Due Date and Time 1/5/2023 2:00PM The construction is planned to start: MAY 15, 2023 Construction duration: 3 MONTHS The University reserves the right to reject any or all Bids, in whole or in part, to award any item, group of items, or total bid; and to waive any informality or technical defects; if it is deemed to be in the best interest of the University. The University is engaged in a multi-year project to upgrade its network equipment and wired access infrastructure to the current standards. As part of this effort this coming summer two academic complexes need upgrading: Hartford School of Law: 1. Hosmer Hall - Site of faculty offices, the Insurance Law Center, and Janet M. Blumberg Hall, where many law school events are held. 2. Knight Hall - Site of faculty offices, the Insurance Law Center, and Janet M. Blumberg Hall, where many law school events are held. Base Bid: Hosmer Hall - The Building will require replacing existing cable wiring. Currently there are multiple telecom rooms that will be condensed into one expanded TR Room TR113 on the 1st Floor. TR113 will be expanded into a with the assistance of UConn Facilities - FO Department. Hosmer Hall Building characteristics: Hartford Law School Campus - Hosmer Hall (4) floors: Basement, First, Second floors and 3rd Floors. (1) Existing TR113 on the 1st floor will be expanded with assistance from UConn Facilities-FO. Knight Hall - The Building will require replacing existing cable wiring. The current telecom room 005 will be expanded into TR Room 003 by installing to support copper and fiber backbones. Knight Building characteristics: Hartford Law School Campus - Knight Hall (3) floors: Basement, First and Second floors. (1) Existing TR 005 in the basement shall be relocated to new basement TR 003.
Bid Results
Educational
$326,241.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 24, 2023
February 23, 2023
55 Elizabeth St, Hartford, CT
Related To This Project
Hartford, CT
--
Hartford, CT
Bid Date: Apr 21 2022
Hartford, CT
Bid Date: Aug 25 2022
Hartford, CT
Bid Date: Aug 29 2022
Hartford, CT
--
Hartford, CT
Bid Date: Aug 15 2022
Hartford, CT
Bid Date: Aug 11 2022
Hartford, CT
--
Hartford, CT
Bid Date: Jul 18 2022
Hartford, CT
Bid Date: Aug 09 2022
Hartford, CT
Bid Date: Aug 04 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
New Year, New Possibilities. Make the connections you need to kickstart 2025.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.