BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 20, 2023 at 8:00 PM

Updated January 25, 2024

Site work and paving for a mixed-use development in Castle Rock, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The work to be performed under this contract includes removal and replacement of existing concrete including crosspan, sidewalk, curb and gutter, curb ramps. Perform full depth reclamation, and various thicknesses of asphalt paving within the street(s) listed in the Appendices or as directed by the Project Manager. The Contractor shall supply all labor, equipment, and materials necessary to complete the work in accordance with these specifications. The contract shall be awarded based on bids received for Bid Schedule A and the contract documents. Work on Mikelson Blvd shall begin May 30, and completed before July 14, to avoid school traffic issues. Contractor will be required to coordinate construction activities with adjacent businesses, trash removal companies, school district, HOA, Metro Districts, and other Town maintenance projects if applicable. Contractor shall acquire all Town of Castle Rock and State of Colorado stormwater permits as applicable, approved TESC plans will be provided after notice of award is issued. The contractor shall commence work no later than three (3) calendar days from, and including, the date of the Notice to Proceed, and be construction complete (punchlist items, cleanup, and demobilize) within one hundred and sixty days (160) working days from the date on the Notice to Proceed. If "Construction Completion" is not issued within the allotted contract time for the original scope of work, "Liquidated Damages" shall be assessed. When contract work is complete, the contractor shall commence work on punchlist items, cleanup, and demobilizing regardless of contract time remaining. Work shall take place between April 3, 2023 and November 3, 2023. A schedule of sequencing of all work shall be submitted at or before the project pre-construction meeting, and approved by the Town prior to issuance of Notice to Proceed. Buyer's Requirements General Requirements - Bidder Prequalification/Preregistration Required - Bid Deposit Required - Insurance Required Question Acceptance Deadline 01/11/2023 06:30 PM EST Questions are submitted online No

Award

Roads / Highways

$7,582,917.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

74 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
240
Active Projects
124
Bidding Soon
1,464
All Active Projects
689
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2023

April 4, 2023

img_map_placeholder

Multiple Locations, Castle Rock, CO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.