Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a educational facility.
Carson - BAS Upgrade Project Management and Financial Oversight - Various Trades Vendor (over $25,000 vendors) PLA for work over 25K ONLY 01052023 Questions Due Date: Dec 16th 2022, 3:30 PM CST This bid is for project management and financial oversight relating to the BAS upgrade work by Precision Controls: Precision Control Systems of Chicago, Inc. (PCSOC) is pleased to provide this proposal for the following scope at the aforementioned buildings/facilities. Scope: o CPS TC Upgrade OPR Scope Key: Type C (Phase 1) o Sequences of operation for replaced/upgraded controllers shall be Invitation to Bid programmed in accordance with CPS standards and per CPS BAS team direction. o PCSOC to perform point checkout and deficiency list for all upgraded controllers. o Legacy software upgrade/migration to Tridium Niagara N4. o 16 hours of commissioning support are included. o 16 hours of training on upgraded system are included. o Post-Upgrade Deficiency Assessment/Investigation: o Five (5) days of field technician labor are included to assess/investigate functionality of the FPB/VAV controllers (qty. 63) and connected control devices. o Network Controller Upgrade Description: o De-terminate power and communication from two (2) DMS-3500 network controllers. Demolish DMS-3500 controllers. o Provide two (2) new JACE-8000 network controller and appurtenances. o Wire control power and re-terminate the existing-to-remain communication busses to new JACE-8000 network controllers. o Program and develop graphics. o Controller Upgrades Description: o Air Handling Units AHU-1, AHU-2, AHU-3 Controllers 2-1, 1-1, 2-3 (Qty. 3): De-terminate I/O, control power, and communications from existing MicroSmart controller. Demolish controller. Furnish, mount, and wire new, replacement BACnet/IP controller. Replace existing AHU temperature sensors with new. Perform programming and check-out on new controller to verify proper operation. Utilize CPS standard sequence of operation for AHU equipment/type and available I/O. o Air Handling Unit AHU-4, Chilled Water System Controller 1-2: De-terminate I/O, control power, and communications from existing MicroSmart controller. Demolish controller. Furnish, mount, and wire new, replacement BACnet/IP controller. Replace existing temperature sensors with new. Perform programming and check-out on new controller to verify proper operation. Utilize CPS standard sequence of operation for AHU, water system equipment/type and available I/O. o Hot Water System Controller 2-2: De-terminate I/O, control power, and communications from existing MicroSmart controller. Demolish controller. Furnish, mount, and wire new, replacement BACnet/IP controller. Replace existing temperature sensors with new. PRECISION CONTROL SYSTEMS OF CHICAGO, INC. PAGE 2 OF 4 1980 UNIVERSITY LANE, LISLE, IL 60532 | PHONE: (630) 521-0234 | FAX: (630) 521-0556 | WEBSITE: WWW.PCSOC.COM PROPOSAL Perform programming and check-out on new controller to verify proper operation. Utilize CPS standard sequence of operation for water system equipment/type and available I/O. o Repairs Description: o Air Handling Unit AHU-1: Furnish, mount, and wire eight (8) replacement OA damper actuators. Existing actuators are not operating. Furnish, mount, and wire one (1) chilled water coil control valve actuator and linkage. Existing actuator is not operational. o Air Handling Unit AHU-3: Furnish, mount, and wire the following replacement damper actuators: o Two (2) OA damper actuators. o Two (2) RA damper actuators. o Three (3) EA damper actuators. Furnish, mount, and wire one (1) chilled water coil control valve actuator. Existing actuator is not operational. Furnish, mount, and wire one (1) hot water coil control valve actuator. Existing actuator is not operational. o Labor: Engineering, electrician, programming, and field technician hours as required to complete the above work. o Materials: o As identified above. o All required installation materials. Clarifications/Exceptions: o All CPS network communication/Ethernet cabling, raceway, and terminations between PCSOC-provided network controllers and CPS network is by Others. o Unless noted otherwise, all existing-to-remain field devices/sensors are assumed to be communicating/functioning properly. Items identified in the Project Deficiency List that are able to be addressed solely or in part by PCSOC shall be included in a separate proposal by PCSOC to CPS. Addressing of Project Deficiency List items are not included in the proposed scope above. In general, if any items require further investigation, repair, replacement, a separate proposal will be provided. o Any damper adjustment, repair, or functional troubleshooting is by Others. o Wiring furnished and installed by PCSOC shall comply with all jurisdictional electrical code requirements. o No cutting, patching, or painting provided by PCSOC. o For PCSOC-provided devices located on CPS' network, all IT configuration and permissions are by CPS. o All PCSOC labor to be provided during normal business hours. All of the above for the lump sum of $134,900 Please contact me should you have any questions, require any additional information, or if you 1) Contractor to secure necessary permits. 2) Contractor to field verify dimensions and specifics of all projects listed above before placing bid. 3) Not responsible for contractor errors as a result of non-field verification. 4) Materials and installation must comply with CPS Standards and Specifications 5) Secure job site overnight if work is not completed in one day. 6) If building or CPS properties are damaged during construction, contractor to replace and/or repair as necessary. 7) Provide necessary labor and materials to fix/correct issues preventing any or all of the projects to be marked as completed. 8) All work shall be coordinated with the Board authorized representatives to complete in an agreed upon time frame. 9) Contractor is to remove and dispose of materials torn out and any construction debris. 10) All trash must be removed off-site by contractor. 11) Clean the surrounding area and make sure all is swept of debris. 12) All questions/requests must be received two (2) business days prior to bid closing.
Bid Results
Educational
$144,073.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 5, 2023
February 6, 2023
5516 S Maplewood Ave, Chicago, IL
Related To This Project
Chicago, IL
Bid Date: Jan 05 2023
Chicago, IL
Bid Date: Jan 19 2023
Chicago, IL
Bid Date: Jan 10 2023
Disney II - BAS Upgrade Project Management and Financial Oversight - Various Trades Vendor - 4929651
Chicago, IL
Bid Date: Jan 05 2023
Chicago, IL
Bid Date: Jan 12 2023
Chicago, IL
Bid Date: Jan 05 2023
Chicago, IL
Bid Date: Jan 05 2023
Chicago, IL
Bid Date: Jan 18 2023
Chicago, IL
--
Chicago, IL
Bid Date: Aug 30 2022
Chicago, IL
Bid Date: Aug 16 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.