Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published January 18, 2023 at 7:00 PM
Updated January 26, 2024
Site work for a water / sewer project in Carrollton, Mississippi. Completed plans call for site work for a water / sewer project.
For George Street Pipe Replacement- Removal of Pipe Unclassified Excavation (FM) Crushed Stone, Size 610 Borrow Excavation (FME)(Contractor Fumished)(Class 9) Crushed Stone, Size 610 Hot Mix Asphalt, ST, 12.5MM (Overlay) Saw Cut, Full Depth 72" Aluminized Coated Metal Pipe Construction Stakes Geotextile Fabric, Type V, Headwall "A" (per plans) Headwall "B" (per plan Completion- 60 work days thereafter.
Bid Results
Water / Sewer
$117,939.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 13, 2023
February 13, 2023
George St, Carrollton, MS
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
