BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 2, 2023 at 7:00 PM

Updated January 26, 2024

Renovation of a mixed-use development in Danville, Kentucky. Completed plans call for the renovation of a educational facility.

The project consists of roof replacement of Low Sloped Roofs & Metal Roof PVC flute fill and overlay. 1. Low Slope: Remove existing roof system, down to existing roof deck. Install 2-Ply SBS Modified Bituminous Membrane Roofing system over ridged layer insulation, and cover board insulation. Provide crickets where indicated. 2. Metal Roof: Remove existing gutters. Install new flute fill insulation and cover board, Install PVC Membrane roof system with mechanical heat induction attachment & new gutters and downspouts. 3. Masonry: Repointing (150SF) and seal (1,200 SF) at parapet walls.

Award

Educational

$350,067.00

Public - State/Provincial

LEED Certification, Renovation

6

13

2

6

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
88
Bidding Soon
1,080
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2023

February 17, 2023

Project location map

303 S 2nd St, Danville, KY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.