BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 20, 2024 at 8:00 PM

Updated September 21, 2024

Renovation of a clubhouse / community center in Wheeling, Illinois. Completed plans call for the renovation of a clubhouse / community center.

As of September 20, 2024, per owner, this project has been completed. The Wheeling Park District (the "District") is soliciting letters of interest, statements of qualifications, and performance data from qualified professionals for architectural services, including site and facility layout, civil engineering, and architectural design in connection with the following Project: Chevy Chase Country Club Exterior Building Improvements. Renovations to the Chevy Chase Country Club including removing and replacing the entire roof and updating all exterior finishes. The firm shall meet with staffto review the identified locations, costs, and timelines to determine which plan(s) have merit to develop into conceptual drawing(s) for review and selection by the District's Board of Commissioners ("Board") at a Board meeting. As part of this process, in addition to the presentation of a final design to the Board at a Board meeting, the firm will attend meetings, if requested, with the Board to present and discuss concept plans as needed. The firm will develop the selected plan for permitting, bid documents, and construction. This Project shall be completed by December 31, 2023. The Wheeling Park District has already contracted with Camosy Construction of Kenosha, Wisconsin, for Construction Management at Risk services for this project. Specifically, Camosy's construction management will be in two phases - the Pre-Construction Phase, and the Construction Phase. The chosen Architect for this project will be working with Camosy throughout this project. Firms will be expected to provide resident engineers, architects, inspectors, and other technical personnel necessary to observe, monitor, and document a contractor's progress on a project from the start of field operations to final completion. Design teams are encouraged for project efficiency and will be given additional consideration. It is the sole responsibility of the respondent to ensure that the District has received the proposal on time. For further information regarding the RFQ for this Project, please contact Jan Buchs, Executive Director, at 847-465-2935. Jan Buchs Executive Director Wheeling Park District The method of contractor selection has not been determined at this time.

Occupancy

Clubhouse / Community Centers

$3,000,000.00

Public - City

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
532
Active Projects
290
Bidding Soon
3,824
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2023

Project location map

1000 N Milwaukee Ave, Wheeling, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.