BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work, paving and outdoor lighting for a road / highway in Tampa, Florida. Design plans call for site work for a road / highway; for paving for a road / highway; and for outdoor lighting for a road / highway.

As of September 5, 2024, an engineer has been selected and this project is in the design phase. Construction is anticipated to begin in 2025. Engineer information has not been determined. 443781-1 As part of a resurfacing project on US 92 from Ballast Point Road to Sevilla Street, FDOT is proposing median modifications on US 92 at Kensington Avenue by adding a permanent directional median opening and permanent traffic separator along the left turn lane to El Prado Boulevard. The Department is also proposing to add a permanent raised traffic separator to define the median between Fair Oaks Avenue and Lawn Avenue while maintaining current movements at both side streets. *The closed solicitation has been included below for reference: Business Development Initiative Project : This is a Business Development Initiative. District : 07 Selection Method : Letter of Response and Interview Professional Liability Insurance : $250,000.00 Financial Management Numbers : 44378113201 US92/SR600/S Dale Mabry Hwy fr Ballast Pt to Sevilla (BDI) TRC Members (Subject to Change) : Daniel Lauricello Pia Cormier William Parman 23727 US92/SR600/S Dale Mabry Hwy fr N of Ballast Pt to S of Sevilla St (BDI) 23728 SR553/N Park Rd fr US92/SR600/E Baker St to N of I-4/SR400 (BDI) Financial Management Number(s) 23727 - 443781 1 32 01 23728 - 441664 1 32 01 Shortlist Selection Date/Time 1/17/2023 Phase II Submittal Deadline Date/Time 2/07/2023 Technical Review Committee Meeting 1 Date/Time 2/08/2023 Consultant Interviews Date/Time 2/08/2023 Final Selection Date/Time 2/20/2023 Negotiations Period Begin Date 2/28/2023 Negotiations Period Ending Date 3/30/2023 FLDOT - RFP Engineering - US 92/SR 600/S Dale Mabry Hwy fr Ballast Pt to Sevilla (BDI)

Design

Roads / Highways

$4,214,803.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
61
Bidding Soon
1,194
All Active Projects
451
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2025

img_map_placeholder

US-92, Tampa, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.