BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a mixed-use development in Spring Lake, Michigan. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Village of Spring Lake (Owner) is requesting Bids for the construction of the following Project: USDA Utility Improvements The Project include the following Work: Project #1: South Street Utility Improvements Approximately 1,200 feet of street reconstruction on South Street, including water main replacement with lead water service replacement, sanitary sewer lining/replacement, select storm sewer replacement, concrete curb and gutter, select concrete sidewalk, and HMA paving. Reconstruction includes manholes, catch basins, valves, hydrants, fittings, restoration, and all appurtenant work. Project #2: South Lake Lift Station Improvements Improvements to the South Lake Lift Station include modifications to the wet well structure, installation of submersible pumps in wet well, lining wet well, new precast concrete valve chamber structure, new controls and instrumentation, new standby generator and ATS, new control panel enclosure, utility coordination for asset removal/relocation, new force main discharge piping connected to existing force main, removal of pumps, valves, and piping within dry well, decommissioning and abandoning dry well in place, sanitary sewer manhole installation, concrete pad removal and replacement, bypass pumping and/or pump and haul, SESC, restoration, and all appurtenant work. Project #3: Rex/Dixie/Monarch/Liberty Utility Improvements Approximately 1,500 feet of street reconstruction on Rex Street, Dixie Street, Monarch Street, and Liberty Street, including water main replacement with lead water service replacement, sanitary sewer replacement, select storm sewer replacement, select concrete curb and gutter, select concrete sidewalk, and HMA paving. Reconstruction includes manholes, catch basins, leaching basins, valves, hydrants, fittings, restoration, and all appurtenant work. Project #4: North Park Utility Improvements Approximately 1,150 feet of street reconstruction on North Park Street, including water main replacement with lead water service replacement, sanitary sewer lining/replacement, select storm sewer replacement, concrete curb and gutter, select concrete sidewalk, and HMA paving. Reconstruction includes manholes, catch basins, leaching basins, valves, hydrants, fittings, restoration, and all appurtenant work. Project #5: Prospect Street Utility Improvements Approximately 1,400 feet of street reconstruction on Prospect Street, including water main replacement with lead water service replacement, sanitary sewer lining/replacement, select storm sewer replacement, select concrete curb and gutter, select concrete sidewalk, and HMA paving. Reconstruction includes manholes, catch basins, valves, hydrants, fittings, restoration, and all appurtenant work. Project #6: South Park/South Division/Summit Utility Improvements Approximately 1,400 feet of street reconstruction on South Park Street, South Division Street, and Summit Street, including water main replacement with lead water service replacement, sanitary sewer lining/replacement, select storm sewer replacement, concrete curb and gutter, select concrete sidewalk, and HMA paving. Reconstruction includes manholes, catch basins, leaching basins, valves, hydrants, fittings, restoration, and all appurtenant work. Project is federally funded and requires American Iron and Steel (AIS) Standards. This project will be funded by the Village of Spring Lake, along with federal USDA funds and grants Only Bidders who have been prequalified by the Village within the required days in advance of the bid opening in accordance with the Instructions to Bidders section will have their bids opened and read. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. All Proposals shall be made in accordance with Bidding Documents. A Proposal Guarantee payable to the Village of Spring Lake in the sum of five percent (5%) of the amount of the bid must accompany the Proposal in accordance with the Information for Bidders. The right is reserved by the Village of Spring Lake to accept any Proposal, reject any or all Proposals, and to waive informalities in bidding when it is deemed to be in the interest of the Village of Spring Lake. Owner anticipates that the Project's total bid price will be approximately $6,650,000.00. The Project has an expected duration of 1,095 days.

Post-Bid

Water / Sewer

$6,650,000.00

Public - City

Paving, Renovation, Site Work

88

37

4

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
62
Bidding Soon
846
All Active Projects
311
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 18, 2023

March 20, 2023

March 19, 2026

img_map_placeholder

Multiple Locations, Spring Lake, MI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.