BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Hartford City, Indiana. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Estimated Cost is: $900k-$1M All prime contractors, subcontractors, small, minority or women owned enterprises and other interested parties are invited to attend. This meeting is not mandatory, but attendance is strongly recommended. Description of Work: Division I: This project includes installation of approximately 2,160 LF of water main, including water service lines, hydrants, miscellaneous and road restoration. Division II: This project includes repairs and coating of a 300,000-gallon elevated storage tank and a 500,000-gallon elevated storage tank. Division III: This project includes the selective demolition and replacement of the existing aerators, horizontal pressure filters, and associated appurtenances in addition to the replacement of this equipment to rehabilitate the plant for successful operation. Any questions, comments, or requests for clarification should be made to United Consulting. No Bid will be considered unless submitted on a copy of the printed Proposal Form in the Contract Bid Documents. Bidders must obtain bid documents from United Consulting to be included in the project plan holders list to ensure proper notification of any Addendum. Failure to obtain bid documents in this manner may be deemed as non-responsive and may result in bid rejection. Each Bid must include the following completed and executed items: Proposal Form.Form 96 (State Board of Accounts) BIDDER'S Financial Statement (only if required by Form 96). Bid Bond or certified check (5% of Bid amount)E-Verify Affidavit,Bidder's written plan for a program to test Bidder's employees for drugs in accordance with IC 4-13- The work to being performed and the bid to be submitted shall include sufficient and proper sums for all general construction, mechanical installation, labor, materials, permits, licenses, insurance, and so forth incidental to and required for the construction of the facilities. Each bid must be enclosed in a sealed envelope bearing the title of the Project and the name and address of Bidder. All bids must be submitted on the bid forms as identified in the Contract Documents and Specifications. Each bid shall be accompanied by a certified check or acceptable bidder's bond made payable to the Owner, in a sum of not less than five percent (5%) of the total amount of the highest aggregate bid, which check or bond will be held by the Owner as evidence that the bidder will, if awarded the contract, enter into the same with the Owner upon notification for him to do so within ten (10) days of said notification. Approved performance and payment bonds guaranteeing faithful and proper performance of the work and materials, to be executed by an acceptable surety company, will be required of the Contractor at the time of contract execution.The bonds will be in the amount of 100% of the Contract Price and must be in full force and effect throughout the term of the Construction Contract plus a period of twelve (12) months from the date of substantial completion. The Owner reserves the right to reject any bid, or all bids, or to accept any bid or bids, or to make such combination of bids as may seem desirable, and to waive any and all informalities in bidding. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be considered. The Bidders attention is also called to the "Minority/Women Business Participation" requirements contained in the Project Specifications. The Indiana Office of Community and Rural Affairs has adopted a State goal of 10% participation for minority and women owned businesses for construction related or purchase related contracts for the work. State goal of 10% participation for minority and women liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER one thousand and 00/100 dollars ($1,000.00) for each day Bid Result Total Base Bid A Currens Construction $853,650 Total Base Bid B tility Service Co., Inc. $789,700

Award

Water / Sewer

$1,643,350.00

Public - City

Renovation, Site Work

8

15

6

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
42
Bidding Soon
931
All Active Projects
369
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 10, 2023

February 9, 2023

img_map_placeholder

Multiple Locations, Hartford City, IN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.