BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Lynnwood, Washington. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

33rd Ave W to 184th St SW This project will realign 33rd Ave to the new intersection at 33rd Ave W and 184th St SW (the intersection constructed to access Costco). This project will likely be funded by a combination of local funds, grants, and a possible contribution by Alderwood Mall. The road will provide a much needed second route to the western side of Alderwood Mall from the north. It will allow traffic to by-pass the intersection of 184th St SW and Alderwood Mall Parkway which is at capacity much of the time. This extension will also become critical when the Poplar Bridge extension is completed which connects to 33rd Avenue West to the south. This project was one of the projects identified in the City Center Access Study. As of January 18, 2024, this project is included in the City of Lynnwood's 2024-2029 Capital Improvement Program (CIP) and funding is allotted for FY 2027, FY 2028, and FY 2029. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$5,000,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
30
Bidding Soon
897
All Active Projects
365
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2028

img_map_placeholder

33rd Ave W, Lynnwood, WA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.