BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in New York, New York. Contact the soliciting agency for additional information.

Performance of Expert Professional Engineering Design, Quality Assurance, Materials Engineering, Construction Management and Inspections, Engineering Management and Related Technical Services for the John F. Kennedy International Airport Redevelopment Program on an as-needed Basis During a Five-year Term The Port Authority of New York and New Jersey (the Authority or Port Authority) is intending to release a Request for Proposal (RFP) on or about December 2022, for Expert Professional Engineering Design, Quality Assurance, Materials Engineering, Construction Management and Inspections, Engineering Management, and related technical services for John F. Kennedy International Airport Redevelopment Program on an "As-Needed" Basis during a five-year term. If you are interested in receiving updates on this solicitation, please send your contact email address to Mr. Chase Palmer at ropalmer@panynj.gov. The purpose of this notice is to provide awareness of this impending RFP. This notice is being issued solely for informational and planning purposes and does not constitute a solicitation. John F. Kennedy International Airport (JFK) opened in 1948 and originally operated with one terminal and one runway while serving approximately 200,000 passengers annually. Today, JFK operates with six terminals and four runways. In 2018, the airport accommodated an estimated 455,000 flights and served a record of approximately 61.6 million passengers. Demand at the airport is expected to continue to increase, with current forecasts estimating activity reaching 100 million annual passengers by 2050. In February 2017, the Port Authority Board of Commissioners ("the Board") authorized a Phase I Plan for future Airport redevelopment, including development of an Airport Master Plan. This master planning work would focus on a comprehensive, airport-wide framework for transforming JFK into a unified, world-class airport. In December 2018, the Board authorized Phase II planning efforts and supporting construction work including planning for the overall Airport redevelopment and certain improvements and facilities on-Airport, including capacity improvements for AirTrain JFK; a new multi-use aircraft facility shared among all air carriers; extension of Taxiway K4 to better manage current volumes of traffic on the airport's taxiways; a new ground transportation center; and a new central electrical substation. It also authorized an airport-wide work-order program to perform general construction work such as structural steel erection, masonry, building finishes, fire protections, heating, ventilation and air conditioning, and similar tasks. The Port Authority of New York and New Jersey will be seeking an experienced firm ("consultant") with demonstrated aviation experience and technical capabilities in providing engineering design, quality assurance, materials engineering, construction management and inspection, engineering management, and other related technical services, for the JFK Redevelopment Program. The services may include, but not limited to, providing design, quality assurance, materials testing, inspection, and condition surveys, construction management and inspection, engineering management support as well as design-build and design-bid-build of, new parking garages, airport terminals and substations, as well as design and construction of elevated roadways, utility infrastructure improvements, airfield modifications including work within active taxiways, demolition of buildings, extensive maintenance of traffic and new terminal construction. The Consultant will be a source of assistance to the Authority's Engineering Department which, may include, but not limited to, providing multi-discipline professional design services on an array of projects, performing materials testing and inspection, code review and audits, construction management administration and inspections, obtaining support staff, alternate delivery support, and/or other related technical services, to be performed on an "as-needed" task order basis and in coordination with other on-going design and construction projects affected by, or impacting, the JFK Redevelopment Program. The Consultant shall be responsible for all staff, design disciplines, and sub-consultants retained to perform any of the above scope of services and shall be responsible in coordinating all services with other consultants and contractors, as appropriate, and as required by the Authority. The Port Authority will not address questions regarding this Notice of Intent nor the intended release of said Request for Proposal, until the RFP is officially released. The Port Authority at its sole discretion may at any time withdrawal or cancel this Notice of Intent and/or the intended release of the RFP. This Notice of Intent is no assurance that a Proposer(s) will be selected for performance of the subject RFP and/or Scope of Services. Proposers will be provided further details regarding the RFP solicitation including but not limited to, how to propose, proposal due date, pre-proposal meeting, etc., upon release of the Request for Proposal. Service-Disabled Veteran-Owned Set Aside: No

Conceptual

Transportation Terminals

Public - State/Provincial

Service, Maintenance and Supply

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
891
Active Projects
503
Bidding Soon
7,147
All Active Projects
2,984
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 13, 2023

July 13, 2028

img_map_placeholder

To Be Determined, New York, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.