BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in Onamia, Minnesota. Completed plans call for the renovation of a residential development.

It is the Contractors responsibility to identify any and all discrepancies in the scope of work, not meeting Industry Standards or that which is inconsistent with the International Residential Code (IRC), and Mille Lacs Band of Ojibwe 2016 MLB Project Specification Book. All electrical wiring, apparatus and equipment for electric light, heat and power, technology circuits or systems shall comply with the rules of the Department of Commerce or the Department of Labor and Industry, as applicable, and be installed in conformity with accepted standards of construction for safety to life and property. Contractor must reconnect all utilities, service panel or service feed. Also includes gas, propane. Include such equipment or materials identified in the pre-bid conference. Contractor will secure all permits and fees. Contractor is responsible for a thorough investigation of the scope of work. Contractor will repair any damage to the property or structure created by the scope of work. NO WORK SHALL BE PERFORMED UNTIL ALL REQUIRED PERMITS HAVE BEEN ISSUED AND COPIES IN THE POSSESSION OF THE PROJECT COORDINATOR AND /OR MILLE LACS BAND BUILDING OFFICIAL. Work Scope Description: Unless otherwise noted all work shall be completed according to the 2016 MLB Spec Book. Kitchen: 1. Remove and dispose of the kitchen sink, faucet, countertop section only on the sink wall. Do not remove other kitchen countertop on the other side of kitchen. Provide and install new kitchen sink, faucet, plastic laminate countertop with formed backsplash section as specified above. Repair and replace the damaged kitchen cabinet faces as necessary. Submit color and finish samples to the Elder Homeowner prior to ordering. 2. Remove and replace kitchen flooring. Provide and install the new underlayment as required, provide and install new flooring. LVT or Vinyl Plank flooring samples to be provided to Elder Homeowner owner for selection and approval. Front entry: 3. Remove the damaged front, entry door and frame complete. Provide and install new door and frame with new hardware. The new steel entry door and frame must be a minimum of 24 guage steel with deadbolt and lockable lever hardware. 4. Provide all new blocking for hardware support. 5. Include all new hardware with an adjustable security strike plate, provide and install all new weather-stripping, new threshold provided and installed, door must be insulated, polyurethane foam core with factory finish. Minimum of 10 year warranty. 6. Please, review MLBO Spec Book for any questions with regard to entry door and frame installation. Furnace duct cleaning: 7. To be completed near the end of the Renovation after the dusty / dirty part of project is complete to ensure complete and thorough cleaning. 8. Coordinate with Elder Homeowner. Elder Homeowner will move items to provide access as required. Master bathroom: 9. Remove and replace the existing ceiling exhaust fan and light combination. (Include this duct cleaning if possible or provide and replace the flexible duct with new.) 10. Clean walls and ceilings. Drywall at tub / shower area to be replaced. Repair and make all of the necessary repairs to the ceilings and walls. Popcorn ceiling removed / patch drywall / skim coat. Prime and paint walls and ceilings. 11. Remove existing toilet and replace with new toilet. 12. Remove old vanity and replace with a taller vanity complete with sink and faucets. 13. Remove existing and replace ceiling light / exhaust fan combination. Hallway Bathroom: 14. Remove the damaged bathroom door and frame. Provide and install new pre-hung assembly complete with new hardware. 15. Remove existing and replace ceiling light / exhaust fan combination in bathroom. Entire Home: 16. Remove all carpet and flooring. No new carpet. Provide and install new LVT or Vinyl Plank. Include a UNIT PRICE for all new underlayment. Credit back amount not needed as it becomes apparent what is needed for LVT or Vinyl Plank installation. 17. Remove and dispose of old flooring properly. Coordinate schedule with Elder homeowner as the work will need to be completed as rooms are available. 18. Sub-floor repair and or replacement to be included as required prior to new floor.

Post-Bid

Residential Subdivision

$200,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
16
Bidding Soon
344
All Active Projects
160
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 25, 2023

February 27, 2023

img_map_placeholder

43362 Nekamigaag Dr, Onamia, MN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.