EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 21, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Owasso, Oklahoma. Completed plans call for the renovation of a 38,500-square-foot, three-story above grade educational facility.

Sealed Bids for Owasso Public Schools - Owasso Wellness Center Renovation will be received and publicly opened and read aloud. Bids will be received by the INDEPENDENT SCHOOL DISTRICT NUMBER ELEVEN OF TULSA COUNTY, OKLAHOMA, hereinafter referred to as "Owner," in the Education Service Center, 1501 N. Ash Street, Owasso, OK 74055 until 2:00 pm, Thursday, January 26, 2023. The bidding process will be in compliance with the Public Competitive Bidding Act of 1974. Bids must be accompanied by a bid security in the amount of 5% of the bid if the bid equals or exceeds $50,000. By this notice, all provisions of the act apply to this project and are incorporated into notice by reference. Upon receipt of an acceptable bid, the contract will be awarded within thirty days after the opening of bids. The written contract will be executed within ten days thereafter. A pre-bid conference will be held at the Owasso Wellness Center Renovation site at 2:00 PM on Thursday, January 5th, 2023. Attendance at this conference is mandatory for the following trades: Interior Demolition, Fire Suppression, Plumbing, HVAC, and Electrical. The address of the Owasso Wellness Center Renovation site is: 13102 E 88th St Owasso OK 74055 Tentative Notice to Proceed Date: 2/14/23 Preliminary Construction Manager Mobilization Date: 6/12/23 Substantial Completion: 8/4/23 Drawings, specifications and contract documents for construction of the Owasso Wellness Center Renovation can be reviewed at the following locations: Owasso Public Schools Education Service Center 1501 N. Ash St Owasso, OK 74055 All printing costs are the bidder's responsibility. Construction Manager for the project is Lowry Construction Services, Inc. The Architect for the project is The Stacy Group. The Owner reserves the right to reject any or all bids and to waive informalities or minor irregularities in any bid. Every request for such interpretation should be in writing, via email to Jessica Patrick, Lowry Construction Services, jessie@lowrycs.com, and to be given consideration, must be received no later than 5:00 pm on January 23, 2023

Post-Bid

Educational

$800,000.00

Public - City

Renovation

1

5

8

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition, Selective Structure Demolition, Facility Remediation, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Grouting
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roof and Wall Specialties and Accessories, Roof Accessories, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Tiling, Ceramic Tiling, Stone Tiling, Ceilings, Flooring, Resilient Flooring, Resilient Athletic Flooring, Carpeting, Tile Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers, Plastic Lockers, Storage Assemblies
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Window Shades, Roller Window Shades, Casework, Countertops
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Outlets and Inlets, Central Heating Equipment, Furnaces
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Site Clearing, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Turf and Grasses, Plugging
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
57
Bidding Soon
711
All Active Projects
364
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2023

September 13, 2023

img_map_placeholder

13102 East 88th St N, Owasso, OK

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Owasso Wellness Center Renovation - Main Trades

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.