BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a civil project in Incline Village, Nevada. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Expected Scopes that will be sought for upcoming GMPs include: Traffic Control Asphalt Saw-cutting Asphalt Coldmilling Hydrostatic Pressure Testing Waterborne Pavement Striping Tapping & Draining existing pipeline Hauling of effluent treated water Removal & Disposal of asbestos treated pipe Trucking For the Incline Village General Improvement District Effluent Export Pipeline and Storage Granite Construction as the CMAR Contractor, requests Qualification Packages from interested subcontractors for two projects; (1) Effluent Export Pipeline Segment 2, and (2) Storage Tank Project, located in and near the town of Incline Village, Nevada, per Nevada Revised Statute (NRS) 338.16991. Overall project cost is approximately $50 to $70 million. Description of Pipeline project: The Effluent Export Pipeline Segment 2 Project proposes to replace 29,700 lineal feet of existing 16-inch diameter steel pipe with approximately 5,000 lineal feet of welded steel and 24,700 lineal feet of ductile iron pipe in a parallel alignment to the existing pipe. The Segment 2 project begins approximately at the Spooner Pump Station, near Sand Harbor, and continues south within the SR 28 corridor for approximately 5.6 miles ending near Spooner Lake. Description of Storage project: The project includes installation of a 2-million-gallon prestressed concrete storage tank for storage of plant effluent. The storage tank will have a diameter of approximately 105 feet, and a tank wall height of approximately 40 feet. The storage tank will be constructed within the current pond, adjacent to IVGID's Wastewater Recovery Facility located at Incline Village, NV. The earthen dam will be removed, and the bottom of the pond will be graded relatively flat to support the effluent storage tank on native soil material. Scope of work for this Prequalification: Pipeline Traffic Control, Furnish and/or Install 16-inch Welded Steel Pipe, Jack and Bore and/or Pipe Ramming, Hydrostatic Pressure Testing, and Cathodic Corrosion Protection Storage Tank Clearing & Grubbing, Tree Removal, Hydraulic Rock Splitting, Furnish & Install Rip Rap slope protection, Furnish & Install Prestressed Concrete Tank, Furnish & Install SCADA system, Temporary and Permanent Erosion Control, Exterior Protective Coatings. Contractors may submit qualification forms for one or more of the above areas of construction that are included in this project and are proposed to be completed by subcontractors. Certified Disadvantaged Business (DBE) subcontractors are encouraged to participate. For qualification forms & instructions please contact: Jenn Lyons (775) 358-8792 IVGID.CMAR@gcinc.com Please direct requests for information to Jenn Lyons; IVGID.CMAR@gcinc.com Information regarding the project for subcontractors and suppliers may be available through phone call, e-mail, Microsoft Teams meetings. This is not an invitation to bid. Any price proposal submitted by a subcontractor not qualified to submit a proposal pursuant to NRS 338.16991 will be returned to the subcontractor un-opened. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$70,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
17
Bidding Soon
350
All Active Projects
143
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2023

July 6, 2023

img_map_placeholder

Multiple Locations, Incline Village, NV

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.