BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 28, 2023 at 7:00 PM

Updated September 9, 2025

Site work and paving for a sidewalk / parking lot in Scituate, Massachusetts. Completed plans call for paving for a sidewalk / parking lot; and for site work for a sidewalk / parking lot.

Greenbush MBTA Parking, Scituate , MA The work to be performed under the Base Bid of This contract includes, but is not limited to paving, pavement markings and associated work for the parking lot at 247 Driftway, Scituate, Massachusetts. Bid Bond: 5% Performance Bond: 100% Payment Bond: 100% Completion Date: May 15, 2023.

Bid Results

Sidewalks / Parking Lot

$298,967.00

Public - State/Provincial

Paving, Site Work

10

9

2

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
485
Active Projects
180
Bidding Soon
3,698
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 26, 2023

February 27, 2023

Project location map

247 Driftway, Scituate, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.