Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 31, 2023 at 7:00 PM
Updated January 25, 2024
Renovation of a multi-residential development in New Bedford, Massachusetts. Completed plans call for the renovation of a multi-residential development.
Satellite Village Family Development (MA 7-10) - Furnace & water Heater Replacement Contractor Qualification DCAMM Certificate All bidding Requests for Information (RFIs) shall be forwarded to Bowens@macritchie.net by 01/06/2023 at 5:00PM EST All bidding Requests for Information (RFIs) shall be forwarded to Bowens@macritchie.net by 01/06/2023 at 5:00PM EST for filed sub-bids and by 01/06/2023 at 5:00PM EST for general bids Plumbing work consists of: Replacement of (100) existing gas-fired wall-hung tankless domestic water heaters in kind as scheduled. Includes replacement of domestic cold water, hot water and condensate piping around water heater as required to adapt to new water heater. New concentric venting to be provided through attic space using existing penetrations. HVAC work consists of: Replacement of (16) existing gas-fired furnaces with new condensing type furnaces. Also includes installation of new Venting and Intake piping through attic spaces for gable end penetration with concentric fitting. This is a HUD funded project and is subject to Davis Bacon Wage Rates 1. Replacement of all existing gas-fired Water Heaters and Furnaces as scheduled within the Contract Document Drawings and specified within specifications. 2. Replacement of all existing water heater concentric venting with new as indicated in drawings. 3. Installation of new concentric venting for new furnaces as indicated in drawings. 4. Cutting, patching and painting to match existing of walls and soffits as necessary for installation. 5. Installation of new piping and sheet metal fittings as required to adapt new water heaters and furnaces to existing systems. 6. Balancing of air systems connected to furnace, balanced for comfort. Measure airflow before replacement and setting up new furnaces to provide same airflow as existing (as a minimum) and up to 20% over (as a maximum). 7. All work depicted within the Contract Document Drawings
Bid Results
Multi-Residential
$848,288.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
