BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Mauston, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.

The work for which bids are asked includes the following: 2023 Northeast Street & Utility Reconstruction Project in the City of Mauston, WI, Juneau County includes roadway and utility improvements for Prospect Street, Grant Street, Jackson Street, E. Monroe Street, Madison Street, and Water Street. Proposed curb & gutter, sidewalk, curb ramps, asphalt roadway, and driveways will be installed. 1. Roadway reconstruction will include removal of existing pavements, utilities, and utility structures and include installation of approximately: a. Asphalt Pavement - 4,000 tons b. Curb & Gutter - 7,400 LF c. Concrete Sidewalk and Driveways - 34,000 SF 2. Pavement markings, signage, dense graded base (both owner supplied and virgin), geotextiles, and all other surface restoration required to complete the project. 3. Existing 6" Water Main will be replaced with 8" Ductile Iron Water Main. Connections to existing main will be installed via live taps, connection to existing valves, and connections to existing pipes. Hydrants, tees, valves, and services will all be replaced as noted on the plans. Project includes approximately 3,000 lineal feet of watermain. 4. Existing Sanitary Sewer will be replaced, and redundant existing manholes will be abandoned. Sewer main, manholes, and laterals will all be replaced as noted on the plans. Project includes approximately 2,600 lineal feet of sanitary sewer. 5. Proposed storm sewer, structures, and laterals will be installed as noted on the plans. Project includes approximately 600 lineal feet of storm sewer main. Storm sewer laterals will be installed to the right-of-way. Bid Alternate includes replacing ductile iron watermain for C900, PVC water main, and two alley utility replacements (South Union St. alley. and the Grove-Williams alley on the west side of the city). No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. BIDDER is required to deliver the original certified check or bid bond within the 72 hours of bid opening to MSA Professional Services, Inc., Attn: Brian Kehrli, 1230 South Boulevard, Baraboo, WI 53913. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages No bid may be withdrawn within 45 days after the actual date of the opening thereof. OWNER reserves the right to waive any informalities or to reject any or all bids. Questions received less than ten days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

Award

Roads / Highways

$3,069,069.00

Public - City

Paving, Site Work

94

14

2

12

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
35
Bidding Soon
1,248
All Active Projects
334
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 12, 2023

April 1, 2023

October 14, 2023

img_map_placeholder

Multiple Locations, Mauston, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.