Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Fife, Washington. Conceptual plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
As of September 3, 2024, a design consultant is still being selected. A timeline for construction has not been selected yet. Project will install sidewalk with ADA-compliant curb ramps, bike lane with painted buffers, pedestrian-scale luminaires and planter strip buffer. The project will also reconstruct an existing eastbound bus stop from a pull-out to an in-lane stop. Stormwater conveyance and treatment facilities will also be needed. Major features include: Reconfiguring the roadway for multimodal use ADA and pedestrian improvements Stormwater improvements Environmental documentation and preparation of permit applications Utility coordination Design work is anticipated to start in August 2024 and end in February 2025 with the option for the City of Fife to extend it for additional time and money, if necessary. This federally funded project has EEO, ADA and Civil Rights requirements that must be adhered to. Project has a 0% DBE goal. The City of Fife, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252,42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Upon review of the submittals, selected firms will be invited for interviews in June 2024. After the City and WSDOT Local Programs staff interview panel selects the most qualified firm, the City will commence contract negotiations of a proposed scope, schedule and cost-plus fix fee contract for the project. Consultant award is anticipated in July 2024 with a start date in August 2024. Any questions should be directed to Greg Vigoren at 253-896-8214.
Conceptual
Sidewalks / Parking Lot
$650,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 3, 2025
6224 Pacific Hwy E, Fife, WA
Related To This Project
Fife, WA
Bid Date: Feb 16 2023
Fife, WA
Bid Date: Apr 28 2022
Fife, WA
Bid Date: Apr 28 2022
Fife, WA
Bid Date: Apr 21 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.