EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 2, 2023 at 7:00 PM

Updated October 1, 2024

Renovation of a multi-residential development in Akron, Ohio. Completed plans call for the renovation of a multi-residential development.

For Willow Run Apartments - 2023 Interior Renovations and Related Work All bids must be accompanied by a bid guarantee which shall be in the form of either: a) a bond secured by a surety company acceptable to the U. S. Government and authorized to do business in the State of Ohio. The amount of the bond shall be for the full (100%) amount of the bid, plus alternates; b) a certified check, cashier's check, bank draft or irrevocable letter of credit. The amount of the certified check, bank draft, irrevocable letter of credit shall be in the amount of ten percent (10%) of the amount of the bid, plus alternates. The Bid Guarantee shall insure the execution of the contract and the furnishing of a method of assurance of completion by the successful bidder. The assurance of completion shall be: (1) a performance and payment bond in the penal sum of 100 percent (100%) of the full amount of the contract; (2) a twenty percent (20%) cash deposit; or (3) a twenty five percent (25%) irrevocable letter of credit. NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT (Governor's Order of January 27, 1972) Bidders' attention is called to the provision for "EQUAL EMPLOYMENT OPPORTUNITY CLAUSE" and the "STANDARD FEDERAL EQUAL EMPLOYMENT CONSTRUCTION CONTRACT SPECIFICATIONS". The goals, timetables, compliance and regulations set for in the Executive Order deemed part of this solicitation by reference. Each bidder must insure that all employees and applicants for employment are not discriminated against because of their race, color, religion, sex or national origin. Payment for labor as it applies to this work shall not be less than the amount established by the U.S. Department of Labor. Bidder's attention is further called to the provisions of Section 3 of the Housing and Urban Development Act of 1968, as amended (12 U.S.C. 1701u) (Section 3), and are required to comply with all requirements as relates to Section 3, including training and employment opportunities for Section 3 Residents and Business Concerns for this Section 3 covered project. The Akron Metropolitan Housing Authority reserves the right to reject any or all bids, to re-advertise our bids, and to waive any informality in bids received whenever such rejections, re-advertisement or waiver is in the best interest of the Housing Authority. No bid shall be withdrawn for a period of (60) days subsequent to the opening of bids without the consent of the Akron Metropolitan Housing Authority. Persons with disabilities needing assistance are asked to contact AMHA's ADA Coordinator, 100 West Cedar Street, Akron, Ohio 44307, (330) 762-9631 or Ohio Relay at 800-750-0750 at least seven (7) days in advance.

Bid Results

Multi-Residential

$3,707,144.00

Public - County

Renovation

55

24

20

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Quantity Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Site-Cast Concrete, Tilt-Up Concrete, Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roof and Wall Specialties and Accessories, Roof Accessories, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Plastic Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Flooring, Resilient Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Storage Specialties, Postal Specialties
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, HVAC Piping and Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Lighting, Exterior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Site Clearing, Earth Moving, Excavation and Fill, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Plants, Trees
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Manufacturing Equipment, Assembly and Testing Equipment, Applicators
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
186
Active Projects
137
Bidding Soon
1,331
All Active Projects
637
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 20, 2023

March 1, 2023

img_map_placeholder

1367 Doty Dr, Akron, OH

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Interior Renovations and Related Work At Willow Run Apartments

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.