BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Millcreek, Utah. Completed plans call for site work for a road / highway.

Millcreek is seeking bids for construction of new power vaults and electrical conduits including clearing and grubbing, structural excavation, 7'X12' sleeves and risers, surfacing, and fencing Millcreek is seeking bids for construction of new power vaults and electrical conduits including clearing and grubbing, structural excavation, 7'X12' sleeves and risers, surfacing, and fencing. Approximate location is 3300 S from 1300 E to Highland Dr and Richmond St (1300 E) from 3330 S to 3205 S Question Submission Close Date 1/10/2023 1:00 PM MST LIQUIDATED DAMAGES A. Late Completion: Time is the essence of the Contract Documents. Contractor agrees that Owner will suffer damage or financial loss if the Work is not completed on time or within any time extensions allowed in accordance with Part 12 of the General Conditions (Document 00 72 00). Contractor and Owner agree that proof of the exact amount of any such damage or loss is difficult to determine. Accordingly, instead of requiring any such proof of damage or specific financial loss for late completion, Contractor agrees to pay to Owner the amount of $1,000 for each calendar day that extends after the Contract Time until the Work is accepted as Substantially Complete as provided in Article 14.5 of the General Conditions. B. Survey Monuments: No land survey monument will be disturbed or moved until Engineer has been properly notified and the Engineer's surveyor has referenced the survey monument for resetting. The parties agree that upon such an unauthorized disturbance it is difficult to determine the damages from such a disturbance, and the parties agree that Contractor will pay as liquidated damages the sum of $1,000 to cover such damage and expense. C. Interruption of Public Services: No interruption of public services shall be caused by Contractor, its agents or employees, without the Engineer's and Owner's prior written approval. Owner and Contractor agree that in the event Owner suffers damages from such interruption, liquidated damages as stipulated above shall not be deemed to be a limitation upon Owner's right to recover the full amount of damages. C. Deduct Damages from Moneys Owed Contractor: Owner shall be entitled to deduct and retain liquidated damages out of any money which may be due or become due the Contractor. To the extent that the liquidated damages exceed Agreement 00 52 00 - 5 any amounts that would otherwise be due the Contractor, the Contractor shall be liable for such amounts and shall return such excess to the Owner.

Post-Bid

Roads / Highways

$190,000.00

Public - City

Site Work

20

15

36

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
29
Bidding Soon
542
All Active Projects
249
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 24, 2023

February 23, 2023

img_map_placeholder

1300 E 3300 S, Millcreek, UT


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.