Site work and paving for a road / highway in Richmond, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

*As of March 1, 2023, a general contractor has been awarded. For Traffic Signalization and Roadway Improvements to Serve Intersection FM 762 at FM 2977 / Manford Boulevard Bid security in the form of bid bond or cashier's check payable to Fort Bend County Municipal Utility District No. 207 in an amount not less than five percent (5%) of the Bid submitted, must accompany each Bid. The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Bid and/or Contract and bidder/contractor agrees that the Contract can be terminated if the bidder/contractor knowingly or intentionally fails to comply with a requirement of that subchapter. Bidder/Contractor declares that it has not received from a governmental body a notice of noncompliancewith a provision of Subchapter J, Chapter 552, Texas Government Code, or, if such notice has been received, bidder/contractor has taken adequate steps to ensure future compliance with such subchapter and has provided or upon request will provide documentation of same. Fort Bend County Municipal Utility District No. 207 reserves the right to reject any and all bids. The Successful Bidder, if any, will be the responsible Bidder which in the Board's judgment will be most advantageous to the District and result in the best and most economical completion of the Project. (Texas Water Code 49.273). The Contract Time begins to run on the date indicated in the Notice to Proceed. Contractor shall mobilize and begin Work in earnest no later than ten (10) days after the date indicated on the Notice to Proceed. The Work will be substantially complete within 80 calendar days after the date the Contract Time commences. The Work will be finally completed in accordance with Contract Documents within 90 calendar days after the date when the Contract Time commences. Selection of Arbitrator(s) and Scope of Authority: The Parties may select an Arbitrator(s) by mutual agreement. Unless another date is agreed to in writing, the selection must be made within 30 days of the Arbitration demand. If no selection is made, the Arbitrator(s) shall be selected consistent with the Construction Industry Rules of the Arbitration Association of America. The Arbitrator(s), whether selected by agreement or by Construction Industry Rules of the Arbitration Association of America, (1) shall enforce the terms of this Contract as written and as consistent with the laws of Texas, and, to the extent Federal law governs in whole or in part, with applicable Federal law, and (2) shall produce a reasoned written award.

Award

Roads / Highways

$370,949.00

Public - County

Paving, Site Work

85

10

7

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
60
Bidding Soon
2,700
All Active Projects
1,048
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2023

March 13, 2023

img_map_placeholder

Farm to Market Rd 2977 & FM 762 Rd, Richmond, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.